This document describes the fundamental test process, which includes test planning and control, analysis and design, implementation and execution, evaluating exit criteria and reporting, and test closure activities. It discusses the main tasks for each part of the test process, including determining test scope and objectives, developing a test approach and schedule, designing test cases, prioritizing and implementing test cases, executing tests, and evaluating whether exit criteria are met. The goal is to provide a structured approach to testing at all levels from component to system testing.
This document describes the fundamental test process, which includes test planning, analysis and design, implementation and execution, evaluating exit criteria and reporting, and test closure activities. It provides details on the main tasks for each part of the test process, such as determining test scope and objectives, designing test cases, executing tests, assessing if testing goals have been met, and finalizing and archiving test materials for future use. The overall process aims to systematically test software through a planned sequence of activities to uncover defects and ensure quality.
The document describes the fundamental test process, which consists of five main activities:
1) Test planning and control involves determining test objectives, approach, resources, and exit criteria.
2) Test analysis and design takes the test objectives and develops test conditions, cases, and procedures.
3) Test implementation and execution develops testware, executes test cases, and logs results.
4) Evaluating exit criteria assesses if testing is complete based on criteria like coverage.
5) Test closure activities include resolving issues, archiving testware, and evaluating lessons learned.
This document describes the fundamental test process, which includes test planning, analysis and design, implementation and execution, evaluation of exit criteria and reporting, and test closure activities. It discusses the main tasks for each part of the test process, including determining test scope and objectives, designing test cases, developing and prioritizing test cases, creating test data, and executing tests. The document also introduces some common testing terms.
The document describes the fundamental test process, which includes test planning, analysis and design, implementation and execution, evaluating exit criteria and reporting, and test closure activities. It discusses the main tasks for each part of the test process, including determining test scope and objectives, designing test cases, implementing tests, executing tests, and evaluating results. The document provides details on the activities involved in test planning, analysis and design, and implementation and execution.
In this section, we will describe the fundamental test process and activities. These start with test planning and continue through to test closure. For each part of the test process, we'll discuss the main tasks of each test activity.
backlink:
http://sif.uin-suska.ac.id/
http://fst.uin-suska.ac.id/
http://www.uin-suska.ac.id/
Alex Swandi
Program Studi S1 Sistem Informasi
Fakultas Sains dan Teknologi
Universitas Islam Negeri Sultan Syarif Kasim Riau
http://sif.uin-suska.ac.id/
http://fst.uin-suska.ac.id/
http://www.uin-suska.ac.id/
This document describes the fundamental test process, which consists of test planning, analysis and design, implementation and execution, evaluating exit criteria and reporting, and test closure activities. It provides details on the typical tasks involved in each part of the test process, such as determining test scope and objectives during planning, reviewing test basis documents and identifying test conditions during analysis and design, developing and prioritizing test cases and creating test data during implementation, and checking test logs against exit criteria and writing a summary report during evaluation and reporting.
This document describes the fundamental test process, which includes test planning, analysis and design, implementation and execution, evaluating exit criteria and reporting, and test closure activities. It provides details on the main tasks for each part of the test process, such as determining test scope and objectives, designing test cases, executing tests, assessing if testing goals have been met, and finalizing and archiving test materials for future use. The overall process aims to systematically test software through a planned sequence of activities to uncover defects and ensure quality.
The document describes the fundamental test process, which consists of five main activities:
1) Test planning and control involves determining test objectives, approach, resources, and exit criteria.
2) Test analysis and design takes the test objectives and develops test conditions, cases, and procedures.
3) Test implementation and execution develops testware, executes test cases, and logs results.
4) Evaluating exit criteria assesses if testing is complete based on criteria like coverage.
5) Test closure activities include resolving issues, archiving testware, and evaluating lessons learned.
This document describes the fundamental test process, which includes test planning, analysis and design, implementation and execution, evaluation of exit criteria and reporting, and test closure activities. It discusses the main tasks for each part of the test process, including determining test scope and objectives, designing test cases, developing and prioritizing test cases, creating test data, and executing tests. The document also introduces some common testing terms.
The document describes the fundamental test process, which includes test planning, analysis and design, implementation and execution, evaluating exit criteria and reporting, and test closure activities. It discusses the main tasks for each part of the test process, including determining test scope and objectives, designing test cases, implementing tests, executing tests, and evaluating results. The document provides details on the activities involved in test planning, analysis and design, and implementation and execution.
In this section, we will describe the fundamental test process and activities. These start with test planning and continue through to test closure. For each part of the test process, we'll discuss the main tasks of each test activity.
backlink:
http://sif.uin-suska.ac.id/
http://fst.uin-suska.ac.id/
http://www.uin-suska.ac.id/
Alex Swandi
Program Studi S1 Sistem Informasi
Fakultas Sains dan Teknologi
Universitas Islam Negeri Sultan Syarif Kasim Riau
http://sif.uin-suska.ac.id/
http://fst.uin-suska.ac.id/
http://www.uin-suska.ac.id/
This document describes the fundamental test process, which consists of test planning, analysis and design, implementation and execution, evaluating exit criteria and reporting, and test closure activities. It provides details on the typical tasks involved in each part of the test process, such as determining test scope and objectives during planning, reviewing test basis documents and identifying test conditions during analysis and design, developing and prioritizing test cases and creating test data during implementation, and checking test logs against exit criteria and writing a summary report during evaluation and reporting.
The document describes the fundamental test process, which consists of test planning and control, test analysis and design, test implementation and execution, evaluating exit criteria and reporting, and test closure activities. It discusses the main tasks for each part of the test process, including determining test objectives and scope, designing test cases, implementing tests, executing tests, logging results, and reporting issues. Key terms related to software testing such as test plan, test strategy, regression testing, and test log are also introduced.
Test Documentation Based On Ieee829 155261tonynavy
This document provides templates for test documentation including test plans, test design specifications, test procedure specifications, test cases, and test reports. The templates are based on the IEEE 829 standard and are intended to help ensure that test documentation includes essential information and supports testing activities. The templates can be adapted as needed for different projects and contexts.
This document provides an annotated outline for a Software Test Plan, adapted from the IEEE Standard for Software Test Documentation. It includes introductory sections that describe the objectives, testing strategy, scope, reference materials, and definitions for the test plan. It also includes sections that specify the test items to be covered, features to be tested and not tested, and the overall testing approach. The approach section describes the types of testing to be performed at different levels, including component, job control, user procedures, and operator procedures testing.
The document discusses test planning and outlines several topics that should be addressed in a test plan, including high-level expectations, people and resources, definitions, test phases and strategies, resource requirements, tester assignments, schedules, test cases, bug reporting, metrics, and risks. The overall goal of test planning is to communicate the testing team's intentions, expectations, and understanding of the testing to be performed.
This document discusses the importance of test data documentation. It defines test data as samples of valid and invalid data used for testing. Documenting test data has advantages like reusing data for regression testing and aiding user acceptance testing. Test design techniques like boundary value analysis and equivalence partitioning help identify test data by partitioning inputs. The document emphasizes generating comprehensive test data through templates and linking it to test scripts to ensure test coverage.
Test planning involves prescribing the scope, approach, resources, and schedule for testing activities. It helps identify items and features to be tested as well as risk items. Test planning should occur early in the project lifecycle to note any risk factors that could jeopardize testing and include a testing schedule. The purpose is to help those outside the test group understand how and why product validation will take place.
This document discusses the process of test planning and control for software testing. It describes the major tasks involved in test planning such as determining scope and risks, developing a test approach, and scheduling tests. It also covers test control which includes measuring results, monitoring progress, and making decisions. Test implementation and execution are outlined as transforming test conditions into test cases, executing tests, and reporting discrepancies. Evaluating exit criteria and test closure are the final stages discussed.
Maria Teryokhina presented on testing artifacts in agile projects. She discussed common testing artifacts like test plans, test cases, defects, and reports/metrics. She outlined the pros and cons of having these artifacts, noting they provide assurance and understanding but can also take time. She suggested not writing certain artifacts for small teams/projects or those with dynamic products where risks are not a priority. The presentation aimed to provide solutions to decrease effort on testing documentation in agile while still maintaining quality.
This test plan outlines the testing strategy for an IIT website. It describes the test items, features that will and won't be tested, and the overall approach. Functionality, integration, user acceptance, and performance testing are included. Risks like requirements changes, resources, and time limitations are addressed. Pass/fail criteria, roles and responsibilities, the schedule, and needs around staffing, training and environment are defined. The goal is to ensure quality and integration of all website modules and features.
The document discusses test planning and documentation. It defines test planning as creating test cases and strategies to control and communicate testing. A test plan scope, approach, resources, schedule and identifies items to test. Objectives are to design verification, manage efforts, and find bugs. It recommends types of tests to cover and provides a template for test plans with components like lists, tables, and matrices.
The document discusses test planning and outlines the key phases and activities in a test planning process. It emphasizes that an important part of planning is creating a test plan that is derived from an overall master test plan. The planning phase involves determining what will be tested based on business needs and risks, and managing the test process and different test types. It stresses the importance of coordination across test levels, phases, and types using a master test plan to avoid duplicative testing.
The document describes the fundamental test process, which can be divided into 5 basic steps: test planning and control, test analysis and design, test implementation and execution, test evaluating exit criteria and reporting, and test closure activities. It provides details on the main tasks for each step, including developing test plans, analyzing test basis, designing and implementing tests, executing tests, evaluating whether exit criteria are met, and closing test activities.
The document describes the IEEE 829 standard for software and system test documentation. The standard specifies eight types of documents for different stages of testing: Master Test Plan, Level Test Plan, Level Test Design, Test Plan, Test Summary Report, Test Case Specification, Test Procedure/Script Specification, and Test Incident Report. Each document has a specific purpose, such as the Master Test Plan providing overall test planning and the Test Incident Report describing bugs to help developers resolve issues.
Test planning is the process of defining and documenting the strategy to verify that a product meets its requirements. A test plan should be created by quality management and answer questions like how, who, what, how long, and test coverage level required. According to IEEE standards, a test plan includes items like test plan identifier, introduction, features to be tested, approach, pass/fail criteria, responsibilities, and schedule. A test design specification describes features to be tested and specifies test scenarios/cases to provide software testing. Test design techniques include static techniques like reviews and dynamic techniques like structure-based, experience-based, and specification-based approaches. Choosing the right technique depends on factors like tester knowledge, expected defects, test objectives,
This document discusses software test documentation standards and processes. It describes the IEEE 829 standard for software test documentation, which includes a test planning and control process involving test plans, analysis and design involving test cases and procedures, implementation and execution involving bug reports and test procedures, and evaluation and reporting involving status reports and test logs. It provides details on various test documentation artifacts like test plans, test designs, test cases, test procedures, and reports. It explains the purpose, structure, and contents of each artifact to provide documentation at different stages of the testing process.
The document outlines the IEEE standard format for a test plan, including 19 sections that provide identifiers, references, introductions, test items, risks, features to be tested, approaches, pass/fail criteria, schedules, responsibilities, and other key elements of an effective test plan. It provides examples and explanations for each section to guide users in developing a comprehensive test plan according to IEEE standards.
Aliaa delivered a session in the topic of “Test planning” using a new technique of delivering content through games and knowledge sharing instead of instructive technique. The session covered all test planning activities including defining test items, risk assessment techniques, testing strategies, planning for testing resources, testing scheduling, and test deliverables and the final test plan documents.
The session introduced to quality team at ITWorx (June , 2013)
Test planning involves defining the scope, objectives, and activities for testing a project. It is done early in the project and produces a master test plan. Key activities include identifying what needs testing, assigning roles and resources, and defining entry and exit criteria. Estimating test effort can be done using metrics from past projects or by eliciting estimates from subject matter experts. Product characteristics, development processes, and expected test outcomes all impact the level of effort required for testing.
This document provides a template for a software test plan, with guidance and examples for the typical sections included in a test plan. The sections covered include an introduction, scope, test plan identification, references, test items, features to be tested, testing approach, personnel, management and metrics, and estimation and scheduling. The template is intended to help guide the creation of a comprehensive test plan that covers all essential aspects of testing for a project.
This document presents a test plan for version 1.0 of the IIT official website. It outlines the test items, features to be tested, approach, environment, responsibilities, and schedule. The test items include the website and its modules like achievements, gallery, news, programs, batches, courses, faculty, exams, results, groups, profile, documents, attendance, projects, calendar, and alumni. Features to be tested include adding, modifying, and viewing albums in the gallery module. The test plan follows IEEE 829 standards and will test the website on different client platforms.
The document describes the fundamental test process, which consists of 5 main activities:
1) Test planning and control, which involves determining test objectives, approach, and exit criteria.
2) Test analysis and design, which involves reviewing requirements, designing test conditions and cases.
3) Test implementation and execution, which involves developing testware, executing tests, and logging results.
4) Evaluating exit criteria and reporting, which involves checking tests against criteria and reporting outcomes.
5) Test closure activities, which include finalizing testware, resolving issues, and evaluating lessons learned.
In this section, we will describe the fundamental test process and activities. These start with test planning and continue through to test closure. For each part of the test process, we'll discuss the main tasks of each test activity.
In this section, you'll also encounter the glossary terms confirmation testing, exit criteria, incident, regression testing, test basis, test condition, test coverage, test data, test execution, test log, test plan, test strategy, test summary report and testware.
The document describes the fundamental test process, which consists of test planning and control, test analysis and design, test implementation and execution, evaluating exit criteria and reporting, and test closure activities. It discusses the main tasks for each part of the test process, including determining test objectives and scope, designing test cases, implementing tests, executing tests, logging results, and reporting issues. Key terms related to software testing such as test plan, test strategy, regression testing, and test log are also introduced.
Test Documentation Based On Ieee829 155261tonynavy
This document provides templates for test documentation including test plans, test design specifications, test procedure specifications, test cases, and test reports. The templates are based on the IEEE 829 standard and are intended to help ensure that test documentation includes essential information and supports testing activities. The templates can be adapted as needed for different projects and contexts.
This document provides an annotated outline for a Software Test Plan, adapted from the IEEE Standard for Software Test Documentation. It includes introductory sections that describe the objectives, testing strategy, scope, reference materials, and definitions for the test plan. It also includes sections that specify the test items to be covered, features to be tested and not tested, and the overall testing approach. The approach section describes the types of testing to be performed at different levels, including component, job control, user procedures, and operator procedures testing.
The document discusses test planning and outlines several topics that should be addressed in a test plan, including high-level expectations, people and resources, definitions, test phases and strategies, resource requirements, tester assignments, schedules, test cases, bug reporting, metrics, and risks. The overall goal of test planning is to communicate the testing team's intentions, expectations, and understanding of the testing to be performed.
This document discusses the importance of test data documentation. It defines test data as samples of valid and invalid data used for testing. Documenting test data has advantages like reusing data for regression testing and aiding user acceptance testing. Test design techniques like boundary value analysis and equivalence partitioning help identify test data by partitioning inputs. The document emphasizes generating comprehensive test data through templates and linking it to test scripts to ensure test coverage.
Test planning involves prescribing the scope, approach, resources, and schedule for testing activities. It helps identify items and features to be tested as well as risk items. Test planning should occur early in the project lifecycle to note any risk factors that could jeopardize testing and include a testing schedule. The purpose is to help those outside the test group understand how and why product validation will take place.
This document discusses the process of test planning and control for software testing. It describes the major tasks involved in test planning such as determining scope and risks, developing a test approach, and scheduling tests. It also covers test control which includes measuring results, monitoring progress, and making decisions. Test implementation and execution are outlined as transforming test conditions into test cases, executing tests, and reporting discrepancies. Evaluating exit criteria and test closure are the final stages discussed.
Maria Teryokhina presented on testing artifacts in agile projects. She discussed common testing artifacts like test plans, test cases, defects, and reports/metrics. She outlined the pros and cons of having these artifacts, noting they provide assurance and understanding but can also take time. She suggested not writing certain artifacts for small teams/projects or those with dynamic products where risks are not a priority. The presentation aimed to provide solutions to decrease effort on testing documentation in agile while still maintaining quality.
This test plan outlines the testing strategy for an IIT website. It describes the test items, features that will and won't be tested, and the overall approach. Functionality, integration, user acceptance, and performance testing are included. Risks like requirements changes, resources, and time limitations are addressed. Pass/fail criteria, roles and responsibilities, the schedule, and needs around staffing, training and environment are defined. The goal is to ensure quality and integration of all website modules and features.
The document discusses test planning and documentation. It defines test planning as creating test cases and strategies to control and communicate testing. A test plan scope, approach, resources, schedule and identifies items to test. Objectives are to design verification, manage efforts, and find bugs. It recommends types of tests to cover and provides a template for test plans with components like lists, tables, and matrices.
The document discusses test planning and outlines the key phases and activities in a test planning process. It emphasizes that an important part of planning is creating a test plan that is derived from an overall master test plan. The planning phase involves determining what will be tested based on business needs and risks, and managing the test process and different test types. It stresses the importance of coordination across test levels, phases, and types using a master test plan to avoid duplicative testing.
The document describes the fundamental test process, which can be divided into 5 basic steps: test planning and control, test analysis and design, test implementation and execution, test evaluating exit criteria and reporting, and test closure activities. It provides details on the main tasks for each step, including developing test plans, analyzing test basis, designing and implementing tests, executing tests, evaluating whether exit criteria are met, and closing test activities.
The document describes the IEEE 829 standard for software and system test documentation. The standard specifies eight types of documents for different stages of testing: Master Test Plan, Level Test Plan, Level Test Design, Test Plan, Test Summary Report, Test Case Specification, Test Procedure/Script Specification, and Test Incident Report. Each document has a specific purpose, such as the Master Test Plan providing overall test planning and the Test Incident Report describing bugs to help developers resolve issues.
Test planning is the process of defining and documenting the strategy to verify that a product meets its requirements. A test plan should be created by quality management and answer questions like how, who, what, how long, and test coverage level required. According to IEEE standards, a test plan includes items like test plan identifier, introduction, features to be tested, approach, pass/fail criteria, responsibilities, and schedule. A test design specification describes features to be tested and specifies test scenarios/cases to provide software testing. Test design techniques include static techniques like reviews and dynamic techniques like structure-based, experience-based, and specification-based approaches. Choosing the right technique depends on factors like tester knowledge, expected defects, test objectives,
This document discusses software test documentation standards and processes. It describes the IEEE 829 standard for software test documentation, which includes a test planning and control process involving test plans, analysis and design involving test cases and procedures, implementation and execution involving bug reports and test procedures, and evaluation and reporting involving status reports and test logs. It provides details on various test documentation artifacts like test plans, test designs, test cases, test procedures, and reports. It explains the purpose, structure, and contents of each artifact to provide documentation at different stages of the testing process.
The document outlines the IEEE standard format for a test plan, including 19 sections that provide identifiers, references, introductions, test items, risks, features to be tested, approaches, pass/fail criteria, schedules, responsibilities, and other key elements of an effective test plan. It provides examples and explanations for each section to guide users in developing a comprehensive test plan according to IEEE standards.
Aliaa delivered a session in the topic of “Test planning” using a new technique of delivering content through games and knowledge sharing instead of instructive technique. The session covered all test planning activities including defining test items, risk assessment techniques, testing strategies, planning for testing resources, testing scheduling, and test deliverables and the final test plan documents.
The session introduced to quality team at ITWorx (June , 2013)
Test planning involves defining the scope, objectives, and activities for testing a project. It is done early in the project and produces a master test plan. Key activities include identifying what needs testing, assigning roles and resources, and defining entry and exit criteria. Estimating test effort can be done using metrics from past projects or by eliciting estimates from subject matter experts. Product characteristics, development processes, and expected test outcomes all impact the level of effort required for testing.
This document provides a template for a software test plan, with guidance and examples for the typical sections included in a test plan. The sections covered include an introduction, scope, test plan identification, references, test items, features to be tested, testing approach, personnel, management and metrics, and estimation and scheduling. The template is intended to help guide the creation of a comprehensive test plan that covers all essential aspects of testing for a project.
This document presents a test plan for version 1.0 of the IIT official website. It outlines the test items, features to be tested, approach, environment, responsibilities, and schedule. The test items include the website and its modules like achievements, gallery, news, programs, batches, courses, faculty, exams, results, groups, profile, documents, attendance, projects, calendar, and alumni. Features to be tested include adding, modifying, and viewing albums in the gallery module. The test plan follows IEEE 829 standards and will test the website on different client platforms.
The document describes the fundamental test process, which consists of 5 main activities:
1) Test planning and control, which involves determining test objectives, approach, and exit criteria.
2) Test analysis and design, which involves reviewing requirements, designing test conditions and cases.
3) Test implementation and execution, which involves developing testware, executing tests, and logging results.
4) Evaluating exit criteria and reporting, which involves checking tests against criteria and reporting outcomes.
5) Test closure activities, which include finalizing testware, resolving issues, and evaluating lessons learned.
In this section, we will describe the fundamental test process and activities. These start with test planning and continue through to test closure. For each part of the test process, we'll discuss the main tasks of each test activity.
In this section, you'll also encounter the glossary terms confirmation testing, exit criteria, incident, regression testing, test basis, test condition, test coverage, test data, test execution, test log, test plan, test strategy, test summary report and testware.
This document describes the fundamental test process, which includes test planning, analysis and design, implementation and execution, evaluating exit criteria and reporting, and test closure activities. It discusses the main tasks for each part of the test process, including determining test scope and objectives, developing test cases and procedures, prioritizing and executing tests, and using exit criteria to determine when testing is complete. The document provides examples and details for each step in the testing process.
Tiara Ramadhani - Program Studi S1 Sistem Informasi - Fakultas Sains dan Tekn...Tiara Ramadhani
Tugas ini di buat untuk memenuhi salah satu tugas mata kuliah pada Program Studi S1 Sistem Informasi.
Oleh ;
Nama : Tiara Ramadhani.
NIM ; 11453201723
SIF VII E
UIN SUSKA RIAU
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)Putri nadya Fazri
In this section, we will describe the fundamental test process and activities. These start with test planning and continue through to test closure. For each part of the test process, we'll discuss the main tasks of each test activity.
Putri Nadya Fazri.
Program Studi S1 Sistem Informasi.
Fakultas Sains dan Teknologi.
Universitas Islam Negeri Sultan Syarif Kasim Riau.
The document discusses the fundamental test process for software testing at different levels. It describes the main activities that occur during testing, including test planning and control, test analysis and design, test implementation and execution, evaluating exit criteria and reporting, and test closure activities. Test planning involves understanding requirements, risks, objectives, and deriving a test plan and approach. Test control involves measuring results, monitoring progress, and making decisions. Test analysis and design identifies test conditions and designs test cases. Test implementation and execution builds testware and sets up environments to run test cases. Evaluating exit criteria assesses when enough testing has been done. Test closure includes delivering results and archiving test materials.
Fundamental test process_rendi_saputra_infosys_USRRendi Saputra
This document outlines the fundamental test process, which consists of test planning and control, test analysis and design, test implementation and execution, evaluating exit criteria and reporting, and test closure activities. It describes the major tasks for each stage of the test process, including reviewing requirements, designing and prioritizing test cases, executing tests, evaluating results against exit criteria, and archiving test materials upon completion. The document was authored by Rendi Saputra for a university course on software testing.
The document outlines the fundamental test process which consists of several main activities that occur at different levels of testing, though less formally for some levels like component testing. It describes the key activities in test planning, control, analysis and design, implementation and execution, evaluating exit criteria, and test closure. The major tasks of each activity are defined such as understanding requirements, deriving the test approach, measuring results, developing and prioritizing test cases, and evaluating if testing has met exit criteria. The document provides an overview of the standard test process.
The document discusses the main activities that occur during different levels of testing, although there may be varying degrees of formality. These include test planning, where test goals and objectives are understood; test design and analysis, where test conditions are identified; test implementation and execution, where test cases and environments are developed; test control, where results are measured and monitored; and evaluating exit criteria to determine if enough testing has been done. Overall, the same types of activities generally occur during testing, but there may be differences in formality between levels like component and system testing.
The document outlines the major tasks involved in a fundamental test process, including test planning and control, test analysis and design, test implementation and execution, evaluating exit criteria and reporting, and test closure activities. It discusses determining test scope and objectives, developing test plans and cases, executing tests, analyzing results, and archiving test materials. The fundamental process aims to systematically test a product through comprehensive planning, design, implementation and evaluation.
Damian Gordon was a Dutch computer scientist born in 1930 in Rotterdam who received the 1972 Turing Award. He developed several programming language principles including that testing shows presence of bugs but not absence, exhaustive testing is impossible, early testing is important, and defects often cluster in small areas of code. He stressed the importance of risk analysis, test objectives, and regularly updating test cases to find new issues rather than relying on the same cases. Testing approaches must also be tailored to contexts like safety-critical systems versus ecommerce.
The document outlines the key activities in a fundamental test process, including test planning and control, test analysis and design, test implementation and execution, evaluating exit criteria and reporting, and test closure activities. It describes the major tasks within each activity in the order they are typically performed, such as determining test scope and objectives in test planning, reviewing requirements and designing tests in test analysis and design, implementing test cases and executing tests, assessing whether exit criteria are met, and archiving testware upon completion.
This document discusses the software testing life cycle (STLC). The STLC is a systematic process that follows a series of phases to ensure software quality. It aims to identify defects early. The main phases discussed are test planning, test case development, test execution, and test closure. A test plan is a key document that describes testing areas and activities. It outlines the test strategy, objectives, schedule, resources, and deliverables. The test plan serves as a guide for testing and helps determine timelines, estimate resources, and avoid issues.
The document discusses software testing concepts including:
- Quality assurance ensures processes are established to produce products that meet specifications.
- Testing determines if a product meets requirements and identifies failures to meet requirements.
- A test plan is written by the lead tester and includes the testing strategy, resources, and plans. It outlines test cases and procedures to validate software meets specifications.
- Testing begins in the define system phase to ensure requirements are testable, and continues through subsequent phases including product testing, acceptance testing, and deployment. Documentation and repeatable processes are critical to quality assurance.
The document provides guidance on how to write an effective test plan. It explains that a test plan is a written document that describes the methodology, parameters, tools, and timetable for testing a software solution or system. It ensures the software fulfills requirements for functionality and quality. The document outlines key components that should be included in a test plan such as test coverage, test methods, test responsibilities, resources needed, dependencies and risks. It emphasizes the importance of planning testing activities and having the necessary resources. Different types of test plans are discussed for different testing levels and types.
The correct answer is c. The quality of the information used to develop the tests is a factor that influences the test effort involved in most projects. Factors like requirements documentation, software size, life cycle model used, process maturity, time constraints, availability of skilled resources, and test results all impact the test effort.
The test planning stage involves identifying standards and protocols for test procedure creation, hardware and software requirements for the test environment, test data needs, a preliminary test schedule, and defect tracking procedures. The test plan will outline roles and responsibilities, the test project schedule, planning and design activities, test environment setup, risks and issues, and the required level of thoroughness. Test design addresses defining the number and types of tests, test paths and functions, and required test conditions. Test requirements must be clearly defined and documented before test design so that the basis for test efforts is understood. During test planning, the test team estimates the number and types of test techniques and procedures needed.
The document describes the software testing life cycle (STLC) process which includes test planning, test development, test execution, result analysis, defect management, and summarized reports. It then provides more details on each step, including objectives, participants, and deliverables. It also defines test strategy and test plan documents, describing their purpose and typical components.
The document provides an overview of the software testing life cycle (STLC) which includes test planning, test development, test execution, result analysis, defect management, and summarized reports. It then describes each phase in more detail, outlining key activities, participants, and deliverables. For example, test planning involves preparing test strategies and plans, estimating effort, and identifying risks. Test development consists of writing test cases and scripts, setting up environments, and reviewing test artifacts. The document also defines common testing terms like test plans, test cases, defect priority and severity levels.
The document discusses four specification-based black-box testing techniques: equivalence partitioning, boundary value analysis, decision tables, and state transition testing. It provides definitions and explanations of each technique. For example, it explains that equivalence partitioning involves dividing test conditions into groups that should be handled equivalently by the system, and then testing one condition from each group. It also discusses use case testing and how use cases can help uncover integration defects.
This document discusses important factors to consider when introducing a new tool into an organization. It emphasizes that the tool should address real needs within the organization and support existing processes rather than dictate new ones. A pilot project is recommended to test how well the tool fits with the organization's maturity, needs, and ways of working. Objectives for the pilot include learning about the tool, seeing how it integrates with current practices, and evaluating whether expected benefits are achieved. For successful long-term implementation, an incremental rollout combined with ongoing training, guidelines, process adaptation, and benefit monitoring is advised.
Equivalence partitioning divides test conditions into groups that should be treated equivalently by the system. Only one condition from each partition needs to be tested. Decision tables systematically test combinations of inputs and states by listing the inputs, expected outputs, and test cases. State transition testing models the system as a finite state machine and tests transitions between states. Use case testing identifies test cases that exercise end-to-end system functionality by having an actor perform tasks from start to finish.
The document discusses important factors to consider when introducing a new tool into an organization. It emphasizes that the tool should support, not lead, the organization's processes and maturity. A pilot project is recommended to prove the concept and ensure the tool meets requirements. Objectives of the pilot include learning how the tool fits with current processes, defining standard usage, and evaluating benefits. Success requires an incremental rollout, adapting processes for best fit, training users, and continuous improvement as usage increases.
Tulisan ini memberikan tutorial lengkap untuk menginstal dan menggunakan Thunderbird beserta plugin Enigmail dan GPG untuk mengirim email yang terenkripsi secara aman. Tutorial dimulai dari instalasi Thunderbird, GPG, dan Enigmail; cara konfigurasi akun email dan mengunggah kunci publik; hingga cara mengirim dan membalas email terenkripsi.
No, it's not a robot: prompt writing for investigative journalismPaul Bradshaw
How to use generative AI tools like ChatGPT and Gemini to generate story ideas for investigations, identify potential sources, and help with coding and writing.
A talk from the Centre for Investigative Journalism Summer School, July 2024
(𝐓𝐋𝐄 𝟏𝟎𝟎) (𝐋𝐞𝐬𝐬𝐨𝐧 3)-𝐏𝐫𝐞𝐥𝐢𝐦𝐬
Lesson Outcomes:
- students will be able to identify and name various types of ornamental plants commonly used in landscaping and decoration, classifying them based on their characteristics such as foliage, flowering, and growth habits. They will understand the ecological, aesthetic, and economic benefits of ornamental plants, including their roles in improving air quality, providing habitats for wildlife, and enhancing the visual appeal of environments. Additionally, students will demonstrate knowledge of the basic requirements for growing ornamental plants, ensuring they can effectively cultivate and maintain these plants in various settings.
Total and Subtotal in Reports in Odoo 17Celine George
In Odoo 17 reports, knowing totals and subtotals is essential for understanding business data. This slide breaks down the process into simple steps, enabling users to effortlessly grasp the functionalities and analyze data effectively.
Understanding and Interpreting Teachers’ TPACK for Teaching Multimodalities i...Neny Isharyanti
Presented as a plenary session in iTELL 2024 in Salatiga on 4 July 2024.
The plenary focuses on understanding and intepreting relevant TPACK competence for teachers to be adept in teaching multimodality in the digital age. It juxtaposes the results of research on multimodality with its contextual implementation in the teaching of English subject in the Indonesian Emancipated Curriculum.
Slide Presentation from a Doctoral Virtual Open House presented on June 30, 2024 by staff and faculty of Capitol Technology University
Covers degrees offered, program details, tuition, financial aid and the application process.
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartMohit Tripathi
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
Kalyan Matka Kalyan Result Satta Matka Result Satta Matka Kalyan Satta Matka Kalyan Open Today Satta Matka Kalyan
Kalyan today kalyan trick kalyan trick today kalyan chart kalyan today free game kalyan today fix jodi kalyan today matka kalyan today open Kalyan jodi kalyan jodi trick today kalyan jodi trick kalyan jodi ajj ka.
Techno-pedagogic skills refer to the ability to effectively integrate technology into teaching and learning processes. In simple terms, it means having the knowledge and skills to use digital tools and resources in a way that enhances the learning experience for students. Teachers with these skills can make lessons more engaging and effective by incorporating technologies such as interactive whiteboards, educational apps, online resources, and multimedia tools in the classroom. This approach allows for the creation of interactive and multimedia-rich lessons, catering to different learning styles and providing personalized learning experiences. Overall, techno-pedagogic skills enable teachers to leverage technology to make learning more fun, interactive, and impactful for students in today's digital age. Here’s how it works:
1. Enhanced Engagement: By using technology, teachers can create more engaging lessons. For example, they might use interactive quizzes or educational games that make learning fun and interactive.
2. Personalized Learning: Technology allows teachers to tailor lessons to individual students’ needs and learning styles. They can provide different resources or activities that cater to each student’s strengths and weaknesses.
3. Access to Information: With digital tools and online resources, students have access to a wealth of information beyond traditional textbooks. This helps them explore topics more deeply and from different perspectives.
4. Collaboration: Technology enables collaborative learning experiences where students can work together on projects, share ideas, and learn from each other’s insights.
5. Impactful Teaching: By mastering techno-pedagogic skills, teachers can make their teaching more effective and impactful. They can deliver content in ways that resonate with today’s tech-savvy students, making learning more relevant and meaningful.
Overall, techno-pedagogic skills empower teachers to leverage technology creatively and effectively in the classroom, ultimately enhancing the educational experience and preparing
Artificial Intelligence (AI) has revolutionized the creation of images and videos, enabling the generation of highly realistic and imaginative visual content. Utilizing advanced techniques like Generative Adversarial Networks (GANs) and neural style transfer, AI can transform simple sketches into detailed artwork or blend various styles into unique visual masterpieces. GANs, in particular, function by pitting two neural networks against each other, resulting in the production of remarkably lifelike images. AI's ability to analyze and learn from vast datasets allows it to create visuals that not only mimic human creativity but also push the boundaries of artistic expression, making it a powerful tool in digital media and entertainment industries.
The membership Module in the Odoo 17 ERPCeline George
Some business organizations give membership to their customers to ensure the long term relationship with those customers. If the customer is a member of the business then they get special offers and other benefits. The membership module in odoo 17 is helpful to manage everything related to the membership of multiple customers.
Still I Rise by Maya Angelou
-Table of Contents
● Questions to be Addressed
● Introduction
● About the Author
● Analysis
● Key Literary Devices Used in the Poem
1. Simile
2. Metaphor
3. Repetition
4. Rhetorical Question
5. Structure and Form
6. Imagery
7. Symbolism
● Conclusion
● References
-Questions to be Addressed
1. How does the meaning of the poem evolve as we progress through each stanza?
2. How do similes and metaphors enhance the imagery in "Still I Rise"?
3. What effect does the repetition of certain phrases have on the overall tone of the poem?
4. How does Maya Angelou use symbolism to convey her message of resilience and empowerment?
AI Risk Management: ISO/IEC 42001, the EU AI Act, and ISO/IEC 23894PECB
As artificial intelligence continues to evolve, understanding the complexities and regulations regarding AI risk management is more crucial than ever.
Amongst others, the webinar covers:
• ISO/IEC 42001 standard, which provides guidelines for establishing, implementing, maintaining, and continually improving AI management systems within organizations
• insights into the European Union's landmark legislative proposal aimed at regulating AI
• framework and methodologies prescribed by ISO/IEC 23894 for identifying, assessing, and mitigating risks associated with AI systems
Presenters:
Miriama Podskubova - Attorney at Law
Miriama is a seasoned lawyer with over a decade of experience. She specializes in commercial law, focusing on transactions, venture capital investments, IT, digital law, and cybersecurity, areas she was drawn to through her legal practice. Alongside preparing contract and project documentation, she ensures the correct interpretation and application of European legal regulations in these fields. Beyond client projects, she frequently speaks at conferences on cybersecurity, online privacy protection, and the increasingly pertinent topic of AI regulation. As a registered advocate of Slovak bar, certified data privacy professional in the European Union (CIPP/e) and a member of the international association ELA, she helps both tech-focused startups and entrepreneurs, as well as international chains, to properly set up their business operations.
Callum Wright - Founder and Lead Consultant Founder and Lead Consultant
Callum Wright is a seasoned cybersecurity, privacy and AI governance expert. With over a decade of experience, he has dedicated his career to protecting digital assets, ensuring data privacy, and establishing ethical AI governance frameworks. His diverse background includes significant roles in security architecture, AI governance, risk consulting, and privacy management across various industries, thorough testing, and successful implementation, he has consistently delivered exceptional results.
Throughout his career, he has taken on multifaceted roles, from leading technical project management teams to owning solutions that drive operational excellence. His conscientious and proactive approach is unwavering, whether he is working independently or collaboratively within a team. His ability to connect with colleagues on a personal level underscores his commitment to fostering a harmonious and productive workplace environment.
Date: June 26, 2024
Tags: ISO/IEC 42001, Artificial Intelligence, EU AI Act, ISO/IEC 23894
-------------------------------------------------------------------------------
Find out more about ISO training and certification services
Training: ISO/IEC 42001 Artificial Intelligence Management System - EN | PECB
Webinars: https://pecb.com/webinars
Article: https://pecb.com/article
-------------------------------------------------------------------------------
AI Risk Management: ISO/IEC 42001, the EU AI Act, and ISO/IEC 23894
Fundamental test process
1. By Graham et.al (2011)
FUNDAMENTAL TEST PROCESS
UNIVERSITAS SULTAN
SYARIF KASIM RIAU
http://sif.uin-suska.ac.id/
http://fst.uin-suska.ac.id/
http://www.uin-suska.ac.id/
Muhammad Branikno R
2. In this section, we will describe the fundamental test process and activities.
These start with test planning and continue through to test closure. For each
part of the test process, we'll discuss the main tasks of each test activity.
In this section, you'll also encounter the glossary terms confirmation testing,
exit criteria, incident, regression testing, test basis, test condition, test
coverage, test data, test execution, test log, test plan, test strategy, test
summary report and testware.
Introduction
3. As we have seen, although executing tests is important, we also need a plan of action and a report
on the outcome of testing. Project and test plans should include time to be spent on planning the
tests, designing test cases, preparing for execution and evaluating status. The idea of a
fundamental test process for all levels of test has developed over the years. Whatever the level of
testing, we see the same type of main activities happening, although there may be a different
amount of formality at the different levels, for example, component tests might be carried out
less formally than system tests in most organizations with a less documented test process. The
decision about the level of formality of the processes will depend on the system and software
context and the level of risk associated with the software. So we can divide the activities within
the fundamental test process into the following basic steps:
planning and control;
analysis and design;
implementation and execution;
evaluating exit criteria and reporting;
test closure activities.
Cont…
4. During test planning, we make sure we understand the goals and objectives of
the customers, stakeholders, and the project, and the risks which testing is
intended to address. This will give us what is sometimes called the mission of
testing or the test assignment. Based on this understanding, we set the goals and
objectives for the testing itself, and derive an approach and plan for the tests,
including specification of test activities. To help us we may have organization or
program test policies and a test strategy. Test policy gives rules for testing, e.g.
'we always review the design documents'; test strategy is the overall high-level
approach, e.g. 'system testing is carried out by an independent team reporting to
the program quality manager. It will be risk-based and proceeds from a product
(quality) risk analysis' (see Chapter 5). If policy and strategy are defined already
they drive our planning but if not we should ask for them to be stated and
defined. Test planning has the following major tasks, given approxi- mately in
order, which help us build a test plan:
Test planning and control1
5. Determine the scope and risks and identify the objectives of testing: we consider what
software, components, systems or other products are in scope for testing; the business,
product, project and technical risks which need to be addressed; and whether we are testing
primarily to uncover defects, to show that the software meets requirements, to demonstrate
that the system is fit for purpose or to measure the qualities and attributes of the software.
Determine the test approach (techniques, test items, coverage, identifying and interfacing
with the teams involved in testing, testware): we consider how we will carry out the testing,
the techniques to use, what needs testing and how extensively (i.e. what extent of
coverage). We'll look at who needs to get involved and when (this could include developers,
users, IT infrastruc ture teams); we'll decide what we are going to produce as part of the
testing (e.g. testware such as test procedures and test data). This will be related to the
requirements of the test strategy.
Implement the test policy and/or the test strategy: we mentioned that there may be an
organization or program policy and strategy for testing. If this is the case, during our
planning we must ensure that what we plan to do adheres to the policy and strategy or we
must have agreed with stakeholders, and documented, a good reason for diverging from it.
Cont…
6. Determine the required test resources (e.g. people, test environment, PCs): from the
planning we have already done we can now go into detail; we decide on our team
make-up and we also set up all the supporting hardware and software we require for
the test environment.
Schedule test analysis and design tasks, test implementation, execution and evaluation:
we will need a schedule of all the tasks and activities, so that we can track them and
make sure we can complete the testing on time.
Determine the exit criteria: we need to set criteria such as coverage criteria (for
example, the percentage of statements in the software that must be executed during
testing) that will help us track whether we are completing the test activ ities correctly.
They will show us which tasks and checks we must complete for a particular level of
testing before we can say that testing is finished.
Cont…
7. Test analysis and design is the activity where general testing objectives are trans-
formed into tangible test conditions and test designs. During test analysis and
design, we take general testing objectives identified during planning and build test
designs and test procedures (scripts). You'll see how to do this in Chapter 4. Test
analysis and design has the following major tasks, in approximately the following
order:
Review the test basis (such as the product risk analysis, requirements,
architecture, design specifications, and interfaces), examining the specifications for
the software we are testing. We use the test basis to help us build our tests. We can
start designing certain kinds of tests (called black-box tests) before the code
exists, as we can use the test basis documents to understand what the system
should do once built. As we study the test basis, we often identify gaps and
ambiguities in the specifications, because we are trying to identify precisely what
happens at each point in the system, and this also pre- vents defects appearing in
the code.
Identify test conditions based on analysis of test items, their specifications, and
what we know about their behavior and structure. This gives us a highlevel list of
what we are interested in testing. If we return to our driving example, the
examiner might have a list of test conditions including 'behav ior at road
junctions', 'use of indicators', 'ability to maneuver the car' and so on. In testing,
we use the test techniques to help us define the test condi tions. From this we can
start to identify the type of generic test data we might need.
Test analysis and design2
8. Design the tests (you'll see how to do this in Chapter 4), using techniques to help select representative
tests that relate to particular aspects of the soft ware which carry risks or which are of particular
interest, based on the test conditions and going into more detail. For example, the driving examiner
might look at a list of test conditions and decide that junctions need to include T-junctions, cross
roads and so on. In testing, we'll define the test case and test procedures.
Evaluate testability of the requirements and system. The requirements may be written in a way that
allows a tester to design tests; for example, if the per formance of the software is important, that
should be specified in a testable way. If the requirements just say 'the software needs to respond
quickly enough' that is not testable, because 'quick enough' may mean different things to different
people. A more testable requirement would be 'the soft ware needs to respond in 5 seconds with 20
people logged on'. The testabil ity of the system depends on aspects such as whether it is possible to
set up the system in an environment that matches the operational environment and whether all the
ways the system can be configured or used can be understood and tested. For example, if we test a
website, it may not be possible to iden tify and recreate all the configurations of hardware, operating
system, browser, connection, firewall and other factors that the website might encounter.
Design the test environment set-up and identify any required infrastructure and tools. This includes
testing tools (see Chapter 6) and support tools such as spreadsheets, word processors, project planning
tools, and non-IT tools and equipment - everything we need to carry out our work.
Cont…
9. During test implementation and execution, we take the test conditions and
make them into test cases and testware and set up the test environment. This
means that, having put together a high-level design for our tests, we now start
to build them. We transform our test conditions into test cases and
procedures, other testware such as scripts for automation. We also need to
set up an envi- ronment where we will run the tests and build our test data.
Setting up environ- ments and data often involves significant time and effort,
so you should plan and monitor this work carefully. Test implementation and
execution have the following major tasks, in approximately the following
order:
Test implementation and
execution
3
10. Implementation:
Develop and prioritize our test cases, using the techniques you'll see in Chapter 4,
and create test data for those tests. We will also write instructions for carrying out
the tests (test procedures). For the driving examiner this might mean changing the
test condition 'junc tions' to 'take the route down Mayfield Road to the junction with
Summer Road and ask the driver to turn left into Summer Road and then right into
Green Road, expecting that the driver checks mirrors, signals and maneuvers
correctly, while remaining aware of other road users.' We may need to automate
some tests using test harnesses and automated test scripts. We'll talk about
automation more in Chapter 6.
Create test suites from the test cases for efficient test execution. A test suite is a
logical collection of test cases which naturally work together. Test suites often share
data and a common high-level set of objectives. We'll also set up a test execution
schedule.
Implement and verify the environment. We make sure the test envi ronment has
been set up correctly, possibly even running specific tests on it.
Cont…
11. Execution:
Execute the test suites and individual test cases, following our test proce dures. We might do this
manually or by using test execution tools, accord ing to the planned sequence.
Log the outcome of test execution and record the identities and versions of the software under
test, test tools and testware. We must know exactly what tests we used against what version of the
software; we must report defects against specific versions; and the test log we keep provides an
audit trail.
Compare actual results (what happened when we ran the tests) with expected results (what we
anticipated would happen).
Where there are differences between actual and expected results, report discrepancies as
incidents. We analyze them to gather further details about the defect, reporting additional
information on the problem, identify the causes of the defect, and differentiate between problems
in the software and other products under test and any defects in test data, in test documents, or
mistakes in the way we exe cuted the test. We would want to log the latter in order to improve the
testing itself.
Repeat test activities as a result of action taken for each discrepancy. We need to re-execute tests
that previously failed in order to confirm a fix (confirmation testing or re-testing). We execute
corrected tests and suites if there were defects in our tests. We test corrected software again to
ensure that the defect was indeed fixed correctly (confirmation test) and that the programmers did
not introduce defects in unchanged areas of the software and that fixing a defect did not uncover
other defects (regression testing).
Cont…
12. Evaluating exit criteria is the activity where test execution is assessed against the
defined objectives. This should be done for each test level, as for each we need to
know whether we have done enough testing. Based on our risk assess- ment, we'll
have set criteria against which we'll measure 'enough'. These criteria vary for each
project and are known as exit criteria. They tell us whether we can declare a given
testing activity or level complete. We may have a mix of cov- erage or completion
criteria (which tell us about test cases that must be included, e.g. 'the driving test
must include an emergency stop' or 'the software test must include a response
measurement'), acceptance criteria (which tell us how we know whether the
software has passed or failed overall, e.g. 'only pass the driver if they have
completed the emergency stop correctly' or 'only pass the software for release if it
meets the priority 1 requirements list') and process exit criteria (which tell us
whether we have completed all the tasks we need to do,
e.g. 'the examiner/tester has not finished until they have written and filed the end
of test report'). Exit criteria should be set and evaluated for each test level.
Evaluating exit criteria has the following major tasks:
Evaluating exit criteria and
reporting
4
13. Check test logs against the exit criteria specified in test planning: We look to see
what evidence we have for which tests have been executed and checked, and
what defects have been raised, fixed, confirmation tested, or are out standing.
Assess if more tests are needed or if the exit criteria specified should be
changed: We may need to run more tests if we have not run all the tests we
designed, or if we realize we have not reached the coverage we expected, or if
the risks have increased for the project. We may need to change the exit criteria
to lower them, if the business and project risks rise in impor tance and the
product or technical risks drop in importance. Note that this is not easy to do
and must be agreed with stakeholders. The test manage ment tools and test
coverage tools that we'll discuss in Chapter 6 help us with this assessment.
Write a test summary report for stakeholders: It is not enough that the testers
know the outcome of the test. All the stakeholders need to know what testing
has been done and the outcome of the testing, in order to make informed
decisions about the software.
Cont…
14. During test closure activities, we collect data from completed test activities to consolidate
experience, including checking and filing testware, and analyzing facts and numbers. We may
need to do this when software is delivered. We also might close testing for other reasons,
such as when we have gathered the infor- mation needed from testing, when the project is
cancelled, when a particular milestone is achieved, or when a maintenance release or update
is done. Test closure activities include the following major tasks:
Check which planned deliverables we actually delivered and ensure all incident
reports have been resolved through defect repair or deferral. For deferred
defects, in other words those that remain open, we may request a change in a
future release. We document the-acceptance or rejection of the software system.
Finalize and archive testware, such as scripts, the test environment, and any other test
infrastructure, for later reuse. It is important to reuse whatever we can of testware;
we will inevitable carry out maintenance testing, and it saves time and effort if our
testware can be pulled out from a library of existing tests. It also allows us to
compare the results of testing between software versions.
Test closure
activities
5
15. Hand over testware to the maintenance organization who will support the software
and make any bug fixes or maintenance changes, for use in con firmation testing
and regression testing. This group may be a separate group to the people who
build and test the software; the maintenance testers are one of the customers of
the development testers; they will use the library of tests.
Evaluate how the testing went and analyze lessons learned for future releases and
projects. This might include process improvements for the soft ware development
life cycle as a whole and also improvement of the test processes. If you reflect on
Figure 1.3 again, we might use the test results to set targets for improving reviews
and testing with a goal of reducing the number of defects in live use. We might
look at the number of incidents which were test problems, with the goal of
improving the way we design, execute and check our tests or the management of
the test environments and data. This helps us make our testing more mature and
cost-effective for the organization. This is documented in a test summary report or
might be part of an overall project evaluation report.
Cont…