Software Testing Life Cycle is a sequence of activities conducted during
testing process to ensure software quality goals are met.
There are 6 major phases in STLC model:
PROCESSOF STLCMODEL
Requirement
Analysis
TestPlanning TestCase
Development Environment
Setup
TestExecution
TestClosure
Entry and Exit Criteria in STLC
Entry Criteria
Entry Criteria gives the prerequisite items that must be
completed before testing can begin.
Exit Criteria
Exit Criteria defines the items that must be completed
before testing can be concluded.
1.Requirement Analysis
It is in which test team studies the requirements from a
testing point of view to identify testable requirements.
QA team may interact with various stakeholders to
understand requirements in detail.
Identify types of tests to be performed.
Gather details about testing priorities and focus.
Identify test environment details where testing is supposed to
be carried out.

Recommended for you

CTFL chapter 05
CTFL chapter 05CTFL chapter 05
CTFL chapter 05

The correct answer is c. The quality of the information used to develop the tests is a factor that influences the test effort involved in most projects. Factors like requirements documentation, software size, life cycle model used, process maturity, time constraints, availability of skilled resources, and test results all impact the test effort.

testing principlesmanual testingsoftware testing
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING

Software testing is an investigation conducted to provide stakeholders with information about the quality of the product or service under test. I hope this ppt will help u to learn about software testing.

Fundamental test process
Fundamental test processFundamental test process
Fundamental test process

The document describes the fundamental test process, which can be divided into 5 basic steps: test planning and control, test analysis and design, test implementation and execution, test evaluating exit criteria and reporting, and test closure activities. It provides details on the main tasks for each step, including developing test plans, analyzing test basis, designing and implementing tests, executing tests, evaluating whether exit criteria are met, and closing test activities.

testing and implementationinformation systembook
2.Test Planning
It is a document which contains the plan related to all testing
activities which needs to be done to deliver a quality product.
Senior QA Manager determines test plan strategy along with
efforts and cost estimates for the project.
The focus of the is to describe:
Testduration
Resources
Whatto test
Whatcannotbe
tested
Toolsusedfor
testing
Risksand
contingencies
planning
3.Test Case Development
Testing team write down all test cases.
Prepare test data.
Test cases are reviewed by peer members or QA lead.
This Phase involves the creation,verification and
rework of test cases and test script after the test plan is
ready.
4.Test Environment Setup
Decides the software and hardware conditions under
which a work product is tested.
It can be done in parallel with test case development
phase.
Generic thing may not repeat for every story.
Needs to be discussed in sprint grooming.
We can have multiple QA server.
5.Test Execution
The testers in which testing of the software build is done
based on test plans and test case prepared.
The process consists of test script execution ,test script
maintenance and bug reporting.
It tracks the defects to closure
Test cases are updated with the results.

Recommended for you

Lecture 08 (SQE, Testing, PM, RM, ME).pptx
Lecture 08 (SQE, Testing, PM, RM, ME).pptxLecture 08 (SQE, Testing, PM, RM, ME).pptx
Lecture 08 (SQE, Testing, PM, RM, ME).pptx

The document provides an overview of topics related to software quality assurance including software testing strategies, project management, risk management, and maintenance. It discusses software quality assurance and defines verification and validation. It describes different testing types like unit testing, integration testing, system testing, and validation testing. It also covers ISO standards for testing, SQA plans, testing goals and attributes. Finally, it discusses testing approaches, strategies for validation testing, and the goals of system testing.

emaanserm
Fundamental Test Process
Fundamental Test ProcessFundamental Test Process
Fundamental Test Process

This document discusses the process of test planning and control for software testing. It describes the major tasks involved in test planning such as determining scope and risks, developing a test approach, and scheduling tests. It also covers test control which includes measuring results, monitoring progress, and making decisions. Test implementation and execution are outlined as transforming test conditions into test cases, executing tests, and reporting discrepancies. Evaluating exit criteria and test closure are the final stages discussed.

#sisteminformasi #testing #uinsuska
Fundamental test process hazahara
Fundamental test process hazaharaFundamental test process hazahara
Fundamental test process hazahara

The document discusses the main activities that occur during different levels of testing, although there may be varying degrees of formality. These include test planning, where test goals and objectives are understood; test design and analysis, where test conditions are identified; test implementation and execution, where test cases and environments are developed; test control, where results are measured and monitored; and evaluating exit criteria to determine if enough testing has been done. Overall, the same types of activities generally occur during testing, but there may be differences in formality between levels like component and system testing.

6.Test Closure Activities
Test closure activities are done mostly after the product is
delivered
Test closure activities:
Ensure Test Completion
Handover Test Artifacts
Project Retrospectives
Archive Test Work Products
THANK YOU

More Related Content

Similar to STLC-ppt-1.pptx

Quality Assurance and Testing services
Quality Assurance and Testing servicesQuality Assurance and Testing services
Quality Assurance and Testing services
Boston Technology Corporation
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
Aurobindo Nayak
 
38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers
Maria FutureThoughts
 
CTFL chapter 05
CTFL chapter 05CTFL chapter 05
CTFL chapter 05
Davis Thomas
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
Priyanka Karancy
 
Fundamental test process
Fundamental test processFundamental test process
Fundamental test process
Yoga Pratama Putra
 
Lecture 08 (SQE, Testing, PM, RM, ME).pptx
Lecture 08 (SQE, Testing, PM, RM, ME).pptxLecture 08 (SQE, Testing, PM, RM, ME).pptx
Lecture 08 (SQE, Testing, PM, RM, ME).pptx
SirRafiLectures
 
Fundamental Test Process
Fundamental Test ProcessFundamental Test Process
Fundamental Test Process
Nadia Chairunissa
 
Fundamental test process hazahara
Fundamental test process hazaharaFundamental test process hazahara
Fundamental test process hazahara
Hazahara shadah
 
hp_alm.docx
hp_alm.docxhp_alm.docx
hp_alm.docx
AkshayK706991
 
Test Life Cycle
Test Life CycleTest Life Cycle
Test Life Cycle
Nilesh Patange
 
ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2
Yogindernath Gupta
 
Fundamental test process endang
Fundamental test process endangFundamental test process endang
Fundamental test process endang
endang setianingsih
 
Test plan
Test planTest plan
Test plan
Akhila Bhaskar
 
manual-testing
manual-testingmanual-testing
manual-testing
Kanak Mane
 
Software Test Planning.pptx
Software Test Planning.pptxSoftware Test Planning.pptx
Software Test Planning.pptx
MUHAMMADHARIS784193
 
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
Putri nadya Fazri
 
Top 10 Practices for Software Testing in 2023.pptx
Top 10 Practices for Software Testing in 2023.pptxTop 10 Practices for Software Testing in 2023.pptx
Top 10 Practices for Software Testing in 2023.pptx
Oprim Solutions
 
Fundamental Test Process - APRIDILA ANGGITA SURI
Fundamental Test Process - APRIDILA ANGGITA SURIFundamental Test Process - APRIDILA ANGGITA SURI
Fundamental Test Process - APRIDILA ANGGITA SURI
Apridila Anggita Suri
 
Software Testing 2/5
Software Testing 2/5Software Testing 2/5
Software Testing 2/5
Damian T. Gordon
 

Similar to STLC-ppt-1.pptx (20)

Quality Assurance and Testing services
Quality Assurance and Testing servicesQuality Assurance and Testing services
Quality Assurance and Testing services
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
 
38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers
 
CTFL chapter 05
CTFL chapter 05CTFL chapter 05
CTFL chapter 05
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
 
Fundamental test process
Fundamental test processFundamental test process
Fundamental test process
 
Lecture 08 (SQE, Testing, PM, RM, ME).pptx
Lecture 08 (SQE, Testing, PM, RM, ME).pptxLecture 08 (SQE, Testing, PM, RM, ME).pptx
Lecture 08 (SQE, Testing, PM, RM, ME).pptx
 
Fundamental Test Process
Fundamental Test ProcessFundamental Test Process
Fundamental Test Process
 
Fundamental test process hazahara
Fundamental test process hazaharaFundamental test process hazahara
Fundamental test process hazahara
 
hp_alm.docx
hp_alm.docxhp_alm.docx
hp_alm.docx
 
Test Life Cycle
Test Life CycleTest Life Cycle
Test Life Cycle
 
ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2
 
Fundamental test process endang
Fundamental test process endangFundamental test process endang
Fundamental test process endang
 
Test plan
Test planTest plan
Test plan
 
manual-testing
manual-testingmanual-testing
manual-testing
 
Software Test Planning.pptx
Software Test Planning.pptxSoftware Test Planning.pptx
Software Test Planning.pptx
 
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
 
Top 10 Practices for Software Testing in 2023.pptx
Top 10 Practices for Software Testing in 2023.pptxTop 10 Practices for Software Testing in 2023.pptx
Top 10 Practices for Software Testing in 2023.pptx
 
Fundamental Test Process - APRIDILA ANGGITA SURI
Fundamental Test Process - APRIDILA ANGGITA SURIFundamental Test Process - APRIDILA ANGGITA SURI
Fundamental Test Process - APRIDILA ANGGITA SURI
 
Software Testing 2/5
Software Testing 2/5Software Testing 2/5
Software Testing 2/5
 

Recently uploaded

Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
Murugan Solaiyappan
 
Front Desk Management in the Odoo 17 ERP
Front Desk  Management in the Odoo 17 ERPFront Desk  Management in the Odoo 17 ERP
Front Desk Management in the Odoo 17 ERP
Celine George
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptx
heathfieldcps1
 
How to Create Sequence Numbers in Odoo 17
How to Create Sequence Numbers in Odoo 17How to Create Sequence Numbers in Odoo 17
How to Create Sequence Numbers in Odoo 17
Celine George
 
The basics of sentences session 9pptx.pptx
The basics of sentences session 9pptx.pptxThe basics of sentences session 9pptx.pptx
The basics of sentences session 9pptx.pptx
heathfieldcps1
 
Final_SD_Session3_Ferriols, Ador Dionisio, Fajardo.pptx
Final_SD_Session3_Ferriols, Ador Dionisio, Fajardo.pptxFinal_SD_Session3_Ferriols, Ador Dionisio, Fajardo.pptx
Final_SD_Session3_Ferriols, Ador Dionisio, Fajardo.pptx
shimeathdelrosario1
 
Views in Odoo - Advanced Views - Pivot View in Odoo 17
Views in Odoo - Advanced Views - Pivot View in Odoo 17Views in Odoo - Advanced Views - Pivot View in Odoo 17
Views in Odoo - Advanced Views - Pivot View in Odoo 17
Celine George
 
(T.L.E.) Agriculture: Essentials of Gardening
(T.L.E.) Agriculture: Essentials of Gardening(T.L.E.) Agriculture: Essentials of Gardening
(T.L.E.) Agriculture: Essentials of Gardening
MJDuyan
 
NLC English 7 Consolidation Lesson plan for teacher
NLC English 7 Consolidation Lesson plan for teacherNLC English 7 Consolidation Lesson plan for teacher
NLC English 7 Consolidation Lesson plan for teacher
AngelicaLubrica
 
How to Install Theme in the Odoo 17 ERP
How to  Install Theme in the Odoo 17 ERPHow to  Install Theme in the Odoo 17 ERP
How to Install Theme in the Odoo 17 ERP
Celine George
 
How to Handle the Separate Discount Account on Invoice in Odoo 17
How to Handle the Separate Discount Account on Invoice in Odoo 17How to Handle the Separate Discount Account on Invoice in Odoo 17
How to Handle the Separate Discount Account on Invoice in Odoo 17
Celine George
 
AI_in_HR_Presentation Part 1 2024 0703.pdf
AI_in_HR_Presentation Part 1 2024 0703.pdfAI_in_HR_Presentation Part 1 2024 0703.pdf
AI_in_HR_Presentation Part 1 2024 0703.pdf
SrimanigandanMadurai
 
2024 KWL Back 2 School Summer Conference
2024 KWL Back 2 School Summer Conference2024 KWL Back 2 School Summer Conference
2024 KWL Back 2 School Summer Conference
KlettWorldLanguages
 
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptxChapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
Brajeswar Paul
 
NAEYC Code of Ethical Conduct Resource Book
NAEYC Code of Ethical Conduct Resource BookNAEYC Code of Ethical Conduct Resource Book
NAEYC Code of Ethical Conduct Resource Book
lakitawilson
 
How to Show Sample Data in Tree and Kanban View in Odoo 17
How to Show Sample Data in Tree and Kanban View in Odoo 17How to Show Sample Data in Tree and Kanban View in Odoo 17
How to Show Sample Data in Tree and Kanban View in Odoo 17
Celine George
 
AI Risk Management: ISO/IEC 42001, the EU AI Act, and ISO/IEC 23894
AI Risk Management: ISO/IEC 42001, the EU AI Act, and ISO/IEC 23894AI Risk Management: ISO/IEC 42001, the EU AI Act, and ISO/IEC 23894
AI Risk Management: ISO/IEC 42001, the EU AI Act, and ISO/IEC 23894
PECB
 
Is Email Marketing Really Effective In 2024?
Is Email Marketing Really Effective In 2024?Is Email Marketing Really Effective In 2024?
Is Email Marketing Really Effective In 2024?
Rakesh Jalan
 
The Jewish Trinity : Sabbath,Shekinah and Sanctuary 4.pdf
The Jewish Trinity : Sabbath,Shekinah and Sanctuary 4.pdfThe Jewish Trinity : Sabbath,Shekinah and Sanctuary 4.pdf
The Jewish Trinity : Sabbath,Shekinah and Sanctuary 4.pdf
JackieSparrow3
 

Recently uploaded (20)

Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
 
Front Desk Management in the Odoo 17 ERP
Front Desk  Management in the Odoo 17 ERPFront Desk  Management in the Odoo 17 ERP
Front Desk Management in the Odoo 17 ERP
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptx
 
How to Create Sequence Numbers in Odoo 17
How to Create Sequence Numbers in Odoo 17How to Create Sequence Numbers in Odoo 17
How to Create Sequence Numbers in Odoo 17
 
The basics of sentences session 9pptx.pptx
The basics of sentences session 9pptx.pptxThe basics of sentences session 9pptx.pptx
The basics of sentences session 9pptx.pptx
 
Final_SD_Session3_Ferriols, Ador Dionisio, Fajardo.pptx
Final_SD_Session3_Ferriols, Ador Dionisio, Fajardo.pptxFinal_SD_Session3_Ferriols, Ador Dionisio, Fajardo.pptx
Final_SD_Session3_Ferriols, Ador Dionisio, Fajardo.pptx
 
“A NOSSA CA(U)SA”. .
“A NOSSA CA(U)SA”.                      .“A NOSSA CA(U)SA”.                      .
“A NOSSA CA(U)SA”. .
 
Views in Odoo - Advanced Views - Pivot View in Odoo 17
Views in Odoo - Advanced Views - Pivot View in Odoo 17Views in Odoo - Advanced Views - Pivot View in Odoo 17
Views in Odoo - Advanced Views - Pivot View in Odoo 17
 
(T.L.E.) Agriculture: Essentials of Gardening
(T.L.E.) Agriculture: Essentials of Gardening(T.L.E.) Agriculture: Essentials of Gardening
(T.L.E.) Agriculture: Essentials of Gardening
 
NLC English 7 Consolidation Lesson plan for teacher
NLC English 7 Consolidation Lesson plan for teacherNLC English 7 Consolidation Lesson plan for teacher
NLC English 7 Consolidation Lesson plan for teacher
 
How to Install Theme in the Odoo 17 ERP
How to  Install Theme in the Odoo 17 ERPHow to  Install Theme in the Odoo 17 ERP
How to Install Theme in the Odoo 17 ERP
 
How to Handle the Separate Discount Account on Invoice in Odoo 17
How to Handle the Separate Discount Account on Invoice in Odoo 17How to Handle the Separate Discount Account on Invoice in Odoo 17
How to Handle the Separate Discount Account on Invoice in Odoo 17
 
AI_in_HR_Presentation Part 1 2024 0703.pdf
AI_in_HR_Presentation Part 1 2024 0703.pdfAI_in_HR_Presentation Part 1 2024 0703.pdf
AI_in_HR_Presentation Part 1 2024 0703.pdf
 
2024 KWL Back 2 School Summer Conference
2024 KWL Back 2 School Summer Conference2024 KWL Back 2 School Summer Conference
2024 KWL Back 2 School Summer Conference
 
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptxChapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
 
NAEYC Code of Ethical Conduct Resource Book
NAEYC Code of Ethical Conduct Resource BookNAEYC Code of Ethical Conduct Resource Book
NAEYC Code of Ethical Conduct Resource Book
 
How to Show Sample Data in Tree and Kanban View in Odoo 17
How to Show Sample Data in Tree and Kanban View in Odoo 17How to Show Sample Data in Tree and Kanban View in Odoo 17
How to Show Sample Data in Tree and Kanban View in Odoo 17
 
AI Risk Management: ISO/IEC 42001, the EU AI Act, and ISO/IEC 23894
AI Risk Management: ISO/IEC 42001, the EU AI Act, and ISO/IEC 23894AI Risk Management: ISO/IEC 42001, the EU AI Act, and ISO/IEC 23894
AI Risk Management: ISO/IEC 42001, the EU AI Act, and ISO/IEC 23894
 
Is Email Marketing Really Effective In 2024?
Is Email Marketing Really Effective In 2024?Is Email Marketing Really Effective In 2024?
Is Email Marketing Really Effective In 2024?
 
The Jewish Trinity : Sabbath,Shekinah and Sanctuary 4.pdf
The Jewish Trinity : Sabbath,Shekinah and Sanctuary 4.pdfThe Jewish Trinity : Sabbath,Shekinah and Sanctuary 4.pdf
The Jewish Trinity : Sabbath,Shekinah and Sanctuary 4.pdf
 

STLC-ppt-1.pptx

  • 1. Software Testing Life Cycle(STLC) Presented By: Sangeeta s Shivannavar
  • 2. STLC Software Testing Life Cycle is a sequence of activities conducted during testing process to ensure software quality goals are met. There are 6 major phases in STLC model: PROCESSOF STLCMODEL Requirement Analysis TestPlanning TestCase Development Environment Setup TestExecution TestClosure
  • 3. Entry and Exit Criteria in STLC Entry Criteria Entry Criteria gives the prerequisite items that must be completed before testing can begin. Exit Criteria Exit Criteria defines the items that must be completed before testing can be concluded.
  • 4. 1.Requirement Analysis It is in which test team studies the requirements from a testing point of view to identify testable requirements. QA team may interact with various stakeholders to understand requirements in detail. Identify types of tests to be performed. Gather details about testing priorities and focus. Identify test environment details where testing is supposed to be carried out.
  • 5. 2.Test Planning It is a document which contains the plan related to all testing activities which needs to be done to deliver a quality product. Senior QA Manager determines test plan strategy along with efforts and cost estimates for the project. The focus of the is to describe: Testduration Resources Whatto test Whatcannotbe tested Toolsusedfor testing Risksand contingencies planning
  • 6. 3.Test Case Development Testing team write down all test cases. Prepare test data. Test cases are reviewed by peer members or QA lead. This Phase involves the creation,verification and rework of test cases and test script after the test plan is ready.
  • 7. 4.Test Environment Setup Decides the software and hardware conditions under which a work product is tested. It can be done in parallel with test case development phase. Generic thing may not repeat for every story. Needs to be discussed in sprint grooming. We can have multiple QA server.
  • 8. 5.Test Execution The testers in which testing of the software build is done based on test plans and test case prepared. The process consists of test script execution ,test script maintenance and bug reporting. It tracks the defects to closure Test cases are updated with the results.
  • 9. 6.Test Closure Activities Test closure activities are done mostly after the product is delivered Test closure activities: Ensure Test Completion Handover Test Artifacts Project Retrospectives Archive Test Work Products