Mysore Smart Grid Pilot Project
CESC Mysore
Welcomes Delegates
of
ISGW - 2015
About CESC
• CESC was established in year 2005
• Serves a population of 8.15 million
• Consumers - 2.6 million
• Area covered – 27858 Sqkm
• Annual Consumption 6 billion units
• Districts – 5 – south Karnataka Infrastructure :
11 kV Feeders 1217 nos
11 kV Lines length 34830 km
LT Lines length 72488 km
Distribution Tfrs.11/0.44 kv 69144 nos.
Domestic 2,040,874
Commercial 182,688
LT Industries 32248
Water sup, Public Lighting 36775
Agri. l Irrigation Pumpsets 278,117
HT Consumers 1516
Others ( temp. connections) 27099
Consumers profile
The Mission of Chamundeshwari Electricity supply corporation Ltd., is
to ensure reliable quality power to its customers at competitive prices.
The CESC Mysore is dedicated to achieve these objectives through
 Creative in managing its operation and maintenance
 Empowerment of its staff by constant Upgradation of Technical competence
and Developing Human resource capabilities and delegates power
 Adopting new technologies and practices that are sustainable
 Transparent and accountability in Administration to improve the credibility.
Mission
What is Smart Grid?
…. integration of two infrastructures …
Smart Grid enables…
Loss
Reduction
Efficient billing &
Collection
Increased
Reliability
Power Quality
Improvement
Preventive
Maintenance
Distributed Generation
Management
Peak load
Management
Smart Grid Initiative
• MoP’s key objectives
• Increasing power availability
• Reducing AT&C losses
• Peak load shifting
• Increasing efficiency of operations and
• Optimal utilization of resources for sustainable growth.
CESC Mysore was one of the first utilities to approach MoP for taking up a
Smart Grid Pilot project implementation in its area of service
• Key functionalities
• AMI - Residential & Commercial consumers
• Outage Management – DMS functions
• Peak Load Management
• Condition Monitoring of equipment
• Renewables Integration
• Power Quality
• Analytics, Load modelling & Forecasting
Ministry of Power – GoI took the initiative for fostering Smart Grid Technology
projects in India.
Mysore Smart Grid Pilot Project Area
14 Feeders
473
Distribution
Transformers
24,532
Consumers
VV Mohalla
Division
(ACAD)
>150 MU
Input Energy
Load : 30 MW
ALL Consumer
Types
Res, Comm, Ind and
Agri
Consumer type Consumers Consumption %
LT1-Bhagya
Jyoti
538 0.1 %
LT2-Domestic 19653 15.0 %
LT3-Commercial 2410 5.0 %
LT4-Agri - IP 580 2.8 %
LT5-Industrial 677 11.7 %
LT6-Street Light 316 2.5 %
LT-7 Temporary 233 0.4 %
HT 125 62.6 %
Total 24532 100 %
Good representation of all types of Consumers & Loads !
Covers 10 % of total consumers in Mysore City !
Project Implementation Approach
Smart Grid Maturity Model by Carnegie Mellon University Software Engineering
Institute was utilized to guide the Smart Grid Journey
Develop Vision
& Strategy
Stakeholders
workshops
Conduct
SGMM
Survey
SGMM Analysis
&
Goal Setting
Smart
Grid Use
cases
Construct a
Framework Establish Road
Map / Plan
Benefit Analysis &
Detailed Project
report
1
2
3
9
Sl Smart Grid System Component Quantity
1 Smart Meter system – Automated
Metering Infrastructure (AMI) :
(Smart Meters, Data Concentrator
Units, Modems etc.,)
19487 – Single Phase Meters
2337 - Three Ph. Meters (Industrial Agri IP sets)
150 HT - Customers (Modems for existing meters)
1 Set - Meter Data Acquisition Software
1 Set - Meter Data Management Software
1 Set – Analytics and Visualization Software
2 SCADA , OMS (Outage Management),
FMS (Fault Management) with Fault
Passage Indicators (FPI) for Project
Area Feeders : Hardware and Software
1 Set - covering 14 nos HT Feeders in Project Area
3 Transformer Monitoring System (TMS)
– Hardware and Software
473 DTs Spread in Project Area for monitoring
Condition of DTs
4 Peak Load Management, Demand Side
Management – Demand Response
Application Software
1 set - DSM / DR for Industrial Consumers
5 Consumer Portal, DSM / DR Portal,
Employee portal
1 set - Portals for Consumer Interaction
Pilot Area – Overall Scope
Sl Smart Grid System Component Quantity
6 Renewable Integration – Consumers
Roof Top generation integration for net
metering
Lot
7 Smart Grid Control Center with
Servers & Networking equipment
1 Set
8 Analytics & Visualization Application 1 Set – Data Analytics, Load Forecasting and
Visualization for project Area
Pilot Area – Overall Scope
Project Financials
1. Project Owner : CESC Mysore
2. System Integrator : M/s Enzen Global Solutions Pvt. Ltd. Bangalore
3. Consultant : Powergrid (PGCIL), Gurgaon
Sl Funding Agency Amount in Rs.
Crores
(1 Cr. = 10 MINR)
Amount in USD
1 MoP, GoI 15.52 2.4
2 CESC, Mysore 8.52 1.3
3 System Integrator – Enzen 8.52 1.3
Total 32.56 4.9
Project Investment
Public Private Partnership Model !
12
AMI scope includes Smart Meters capable of two way
communication capability built in along with other
features listed below
 Remote meter reading
 Remote connect /disconnect capabilities
 Outage detection and management
 Tamper detection with disconnection
 Time of Use tariff
 Prepaid / Credit metering mode with
‘over the air’ change provision
 Real-time load monitoring, load
curtailment beyond sanctioned limit
 Energy Audit & signaling for Load control
 Two way messaging - consumption and
pricing information to consumers
 Net metering feature for Roof-top solar
energy integration with the grid
 Meter Data Acquisition and Management
System
1. Advanced Metering Infrastructure (AMI) – Residential,
Industrial & Commercial consumers
Key Components
• Energy Accounting
• Demand side
Management
• AgDSM
• Outage
Monitoring
Applications
2. Outage Management – Distribution Automation
• SCADA - OMS
• Transformer
Monitoring
• Fault
Management
• Condition-based
Monitoring
• Distribution
Management
• Integration with
existing SCADA
Features
Applications
Objectives:
Improve availability and reliability, customer satisfaction, proactive maintenance to
avoid failures based on condition based monitoring
Forecast
Peak Event Customer
Clustering /
Invitation
ToU Pricing –
Incentivizing
scheme
Customer
Voluntary
Participation
Event
Scheduled
Peak Load
Reduction
Effected &
verified
Peak shaving
Web Portal
Interaction
3. Peak Load / Demand Side Management /
Demand Response
Objectives :
Peak Load shifting, Staggering the load through voluntary consumer participation,
enhanced customer satisfaction by load curtailment in place of load shedding.
4. Condition Monitoring System – Distribution
Transformers
The Transformer Condition
Monitoring System (TCMS)
covers the following parameters.,
 Load Parameters
 Load balance /unbalance
 Energy dispensed
 Power Quality parameters
 Power on/off status
 Oil Temperature
 Oil Level – critical
 Surface temperatures
 Ambient temperature
DT : Ganapathy 100 kVA,
SLV Feeder with TMU
Temp
Sensor –
Top Tank
Temp
Sensor -
Middle
Tank
Temp
Sensor -
Ambient
Advanced Analytical applications
Objectives:
Asset condition Monitoring ,
Proactive maintenance,
Power flow monitoring,
reduction of failure rate,
Load modelling, forecasting,
• Sensors and FRTUs on 11 kV Feeders
for real-time monitoring of network
health
• Fault Management communicated
through the FRTU to the FMS at the
SGCC
• Fault localization for operations
support
• The WFM application notifies the
Crew to respond to the fault
5. Fault Management/Work Force Management
Objectives :
Quicker fault location identification, faster mobilization of crew and
support, reliability improvement
Feeder Fault Monitoring System - PoC
o 512 numbers of agricultural consumers
o Smart meters with inbuilt GPRS modem at DT
o MDM to analyse IP Set consumption
o A consumer interactive portal is deployed
6. Agricultural Demand Side Management
Objective :
Creating community awareness for water & energy conservation
through community portals for energy monitoring
7. Advanced Utility Data Analytics:
 Huge amount of Data from Smart Grid devices / equipment
 Visualization – Modelling – Analytics scenarios built
 Load forecasting
 Consumer profiling and consumption pattern analysis
 Theft detection
Applications Deployed at SGCC
• Meter Data Management System –
MDM
• Outage Management System – OMS
• SCADA – Distribution Management
system
• Visualization & Data Analytics
applications
• Peak Load Management
• Transformer Monitoring system
• Fault Management system
• Demand Side Management / Demand
Response
• GIS application interface
• Renewables Integration monitoring
application
• Billing Application interface
To be located at CESC Corporate office –
new premise
8. Smart Grid Control Centre – SGCC
9. Overall Architecture
10. Functional Architecture
Operator
Training
Billing
Determinant
Calculator
Advanced Metering & Distribution Automation
System functionalities
• Shifting / reducing peak load
• Reducing Power Purchase Cost
• Extending transformer asset life
• Reducing OPEX
• Renewable and Distributed
Generation Management
• Better Energy & Water Utilization
• Community AwarenessAg DSM with community portal for self monitoring
Integration of Renewable and Distributed
Generation
Condition Based Asset Monitoring and Mobile work
force management
Peak Load Management with smart load shedding
and voluntary consumer participation.
Outage Management
• Loss reduction
• KPI Improvement
• Increasing supply hours
• Reducing interruption duration
Functionalities Benefits
Key Benefits envisaged
May 2014 Oct 2015
Timelines and Status
Legend Project on track Future Milestones
• Factory Acceptance Tests
• System Integration Tests
• Operational Acceptance Tests
Sl Component Partner Country
1 System Design, Engineering, Project
Management, Implementation – Overall
Responsibility
Enzen Global
Solutions Pvt. Ltd.,
India
2 AMI – Smart Meters & Com munication
systems
Cyan Technologies UK
3 OMS – SCADA – DMS solutions ETAP US
4 MDM – Analytics – Solution Integration Enzen & Esyasoft
Technologies
India
5 Analytics – Forecasting – Solution
Integration
Esyasoft Technologies India
6 Demand Response & Transformer
Management Units
Ecolibrium Energy India
7 Smart Grid Control Center Esyasoft - DELL India
Project Solution Partnerships
1. As is study of the existing system including survey of the 11 kV feeder
network complete.
2. Preparation of the detailed designs and documentation for
implementation complete
3. Approval of the Software Application Architecture Design and blueprint.
4. Approval of Hardware design architecture complete
5. Selection and finalization of AMI solution, including Smart Meters &
Communication network solution provider.
6. Transformer Monitoring System demo units installed at site. Sample
Meter units installed at site for data communication and analysis.
7. First lot of 500 smart meters will be installed by end March 2015.
Present Status of the Project :
8. Control Center equipment such as Servers, workstations, networking
equipment are being installed at “Smart Grid Control Center at CESC
corporate office.
9. All applications such as :
a. Meter Data Acquisition system (MDAS)
b. Meter Data Management System – MDM
c. Outage Management System – OMS
d. SCADA – Distribution Management system
e. Visualization & Data Analytics applications
f. Peak Load Management
g. Transformer Monitoring system
h. Fault Management system
i. Demand Side Management / Demand Response
j. GIS application interface
k. Renewables Integration monitoring application
l. Billing Application interface
are under development and configuration
Present Status of the Project :
Mysore, pilot project
Mysore, pilot project
CESC Corporate Office New Building – Location
of SGCC
http://122.166.217.170:8090/app/home.aspx
Live application – under development, testing and deployment
Snapshot – Live data from DTMU
Snapshot – Load Balancing - Live data from DTMU
Snapshot – Harmonics Distortion - Live data from DTMU
Snapshot – Load and Temperature Live data from DTMU
Snapshot- Meter Data from Sample Meters
Load Forecasting
Mysore, pilot project
Mysore, pilot project
Mysore, pilot project
Mysore, pilot project
Mysore, pilot project
Mysore, pilot project

More Related Content

Mysore, pilot project

  • 1. Mysore Smart Grid Pilot Project CESC Mysore Welcomes Delegates of ISGW - 2015
  • 2. About CESC • CESC was established in year 2005 • Serves a population of 8.15 million • Consumers - 2.6 million • Area covered – 27858 Sqkm • Annual Consumption 6 billion units • Districts – 5 – south Karnataka Infrastructure : 11 kV Feeders 1217 nos 11 kV Lines length 34830 km LT Lines length 72488 km Distribution Tfrs.11/0.44 kv 69144 nos. Domestic 2,040,874 Commercial 182,688 LT Industries 32248 Water sup, Public Lighting 36775 Agri. l Irrigation Pumpsets 278,117 HT Consumers 1516 Others ( temp. connections) 27099 Consumers profile
  • 3. The Mission of Chamundeshwari Electricity supply corporation Ltd., is to ensure reliable quality power to its customers at competitive prices. The CESC Mysore is dedicated to achieve these objectives through  Creative in managing its operation and maintenance  Empowerment of its staff by constant Upgradation of Technical competence and Developing Human resource capabilities and delegates power  Adopting new technologies and practices that are sustainable  Transparent and accountability in Administration to improve the credibility. Mission
  • 4. What is Smart Grid? …. integration of two infrastructures …
  • 5. Smart Grid enables… Loss Reduction Efficient billing & Collection Increased Reliability Power Quality Improvement Preventive Maintenance Distributed Generation Management Peak load Management
  • 6. Smart Grid Initiative • MoP’s key objectives • Increasing power availability • Reducing AT&C losses • Peak load shifting • Increasing efficiency of operations and • Optimal utilization of resources for sustainable growth. CESC Mysore was one of the first utilities to approach MoP for taking up a Smart Grid Pilot project implementation in its area of service • Key functionalities • AMI - Residential & Commercial consumers • Outage Management – DMS functions • Peak Load Management • Condition Monitoring of equipment • Renewables Integration • Power Quality • Analytics, Load modelling & Forecasting Ministry of Power – GoI took the initiative for fostering Smart Grid Technology projects in India.
  • 7. Mysore Smart Grid Pilot Project Area 14 Feeders 473 Distribution Transformers 24,532 Consumers VV Mohalla Division (ACAD) >150 MU Input Energy Load : 30 MW ALL Consumer Types Res, Comm, Ind and Agri Consumer type Consumers Consumption % LT1-Bhagya Jyoti 538 0.1 % LT2-Domestic 19653 15.0 % LT3-Commercial 2410 5.0 % LT4-Agri - IP 580 2.8 % LT5-Industrial 677 11.7 % LT6-Street Light 316 2.5 % LT-7 Temporary 233 0.4 % HT 125 62.6 % Total 24532 100 % Good representation of all types of Consumers & Loads ! Covers 10 % of total consumers in Mysore City !
  • 8. Project Implementation Approach Smart Grid Maturity Model by Carnegie Mellon University Software Engineering Institute was utilized to guide the Smart Grid Journey Develop Vision & Strategy Stakeholders workshops Conduct SGMM Survey SGMM Analysis & Goal Setting Smart Grid Use cases Construct a Framework Establish Road Map / Plan Benefit Analysis & Detailed Project report 1 2 3
  • 9. 9 Sl Smart Grid System Component Quantity 1 Smart Meter system – Automated Metering Infrastructure (AMI) : (Smart Meters, Data Concentrator Units, Modems etc.,) 19487 – Single Phase Meters 2337 - Three Ph. Meters (Industrial Agri IP sets) 150 HT - Customers (Modems for existing meters) 1 Set - Meter Data Acquisition Software 1 Set - Meter Data Management Software 1 Set – Analytics and Visualization Software 2 SCADA , OMS (Outage Management), FMS (Fault Management) with Fault Passage Indicators (FPI) for Project Area Feeders : Hardware and Software 1 Set - covering 14 nos HT Feeders in Project Area 3 Transformer Monitoring System (TMS) – Hardware and Software 473 DTs Spread in Project Area for monitoring Condition of DTs 4 Peak Load Management, Demand Side Management – Demand Response Application Software 1 set - DSM / DR for Industrial Consumers 5 Consumer Portal, DSM / DR Portal, Employee portal 1 set - Portals for Consumer Interaction Pilot Area – Overall Scope
  • 10. Sl Smart Grid System Component Quantity 6 Renewable Integration – Consumers Roof Top generation integration for net metering Lot 7 Smart Grid Control Center with Servers & Networking equipment 1 Set 8 Analytics & Visualization Application 1 Set – Data Analytics, Load Forecasting and Visualization for project Area Pilot Area – Overall Scope
  • 11. Project Financials 1. Project Owner : CESC Mysore 2. System Integrator : M/s Enzen Global Solutions Pvt. Ltd. Bangalore 3. Consultant : Powergrid (PGCIL), Gurgaon Sl Funding Agency Amount in Rs. Crores (1 Cr. = 10 MINR) Amount in USD 1 MoP, GoI 15.52 2.4 2 CESC, Mysore 8.52 1.3 3 System Integrator – Enzen 8.52 1.3 Total 32.56 4.9 Project Investment Public Private Partnership Model !
  • 12. 12 AMI scope includes Smart Meters capable of two way communication capability built in along with other features listed below  Remote meter reading  Remote connect /disconnect capabilities  Outage detection and management  Tamper detection with disconnection  Time of Use tariff  Prepaid / Credit metering mode with ‘over the air’ change provision  Real-time load monitoring, load curtailment beyond sanctioned limit  Energy Audit & signaling for Load control  Two way messaging - consumption and pricing information to consumers  Net metering feature for Roof-top solar energy integration with the grid  Meter Data Acquisition and Management System 1. Advanced Metering Infrastructure (AMI) – Residential, Industrial & Commercial consumers Key Components • Energy Accounting • Demand side Management • AgDSM • Outage Monitoring Applications
  • 13. 2. Outage Management – Distribution Automation • SCADA - OMS • Transformer Monitoring • Fault Management • Condition-based Monitoring • Distribution Management • Integration with existing SCADA Features Applications Objectives: Improve availability and reliability, customer satisfaction, proactive maintenance to avoid failures based on condition based monitoring
  • 14. Forecast Peak Event Customer Clustering / Invitation ToU Pricing – Incentivizing scheme Customer Voluntary Participation Event Scheduled Peak Load Reduction Effected & verified Peak shaving Web Portal Interaction 3. Peak Load / Demand Side Management / Demand Response Objectives : Peak Load shifting, Staggering the load through voluntary consumer participation, enhanced customer satisfaction by load curtailment in place of load shedding.
  • 15. 4. Condition Monitoring System – Distribution Transformers The Transformer Condition Monitoring System (TCMS) covers the following parameters.,  Load Parameters  Load balance /unbalance  Energy dispensed  Power Quality parameters  Power on/off status  Oil Temperature  Oil Level – critical  Surface temperatures  Ambient temperature DT : Ganapathy 100 kVA, SLV Feeder with TMU Temp Sensor – Top Tank Temp Sensor - Middle Tank Temp Sensor - Ambient Advanced Analytical applications Objectives: Asset condition Monitoring , Proactive maintenance, Power flow monitoring, reduction of failure rate, Load modelling, forecasting,
  • 16. • Sensors and FRTUs on 11 kV Feeders for real-time monitoring of network health • Fault Management communicated through the FRTU to the FMS at the SGCC • Fault localization for operations support • The WFM application notifies the Crew to respond to the fault 5. Fault Management/Work Force Management Objectives : Quicker fault location identification, faster mobilization of crew and support, reliability improvement
  • 17. Feeder Fault Monitoring System - PoC
  • 18. o 512 numbers of agricultural consumers o Smart meters with inbuilt GPRS modem at DT o MDM to analyse IP Set consumption o A consumer interactive portal is deployed 6. Agricultural Demand Side Management Objective : Creating community awareness for water & energy conservation through community portals for energy monitoring
  • 19. 7. Advanced Utility Data Analytics:  Huge amount of Data from Smart Grid devices / equipment  Visualization – Modelling – Analytics scenarios built  Load forecasting  Consumer profiling and consumption pattern analysis  Theft detection
  • 20. Applications Deployed at SGCC • Meter Data Management System – MDM • Outage Management System – OMS • SCADA – Distribution Management system • Visualization & Data Analytics applications • Peak Load Management • Transformer Monitoring system • Fault Management system • Demand Side Management / Demand Response • GIS application interface • Renewables Integration monitoring application • Billing Application interface To be located at CESC Corporate office – new premise 8. Smart Grid Control Centre – SGCC
  • 23. Advanced Metering & Distribution Automation System functionalities • Shifting / reducing peak load • Reducing Power Purchase Cost • Extending transformer asset life • Reducing OPEX • Renewable and Distributed Generation Management • Better Energy & Water Utilization • Community AwarenessAg DSM with community portal for self monitoring Integration of Renewable and Distributed Generation Condition Based Asset Monitoring and Mobile work force management Peak Load Management with smart load shedding and voluntary consumer participation. Outage Management • Loss reduction • KPI Improvement • Increasing supply hours • Reducing interruption duration Functionalities Benefits Key Benefits envisaged
  • 24. May 2014 Oct 2015 Timelines and Status Legend Project on track Future Milestones • Factory Acceptance Tests • System Integration Tests • Operational Acceptance Tests
  • 25. Sl Component Partner Country 1 System Design, Engineering, Project Management, Implementation – Overall Responsibility Enzen Global Solutions Pvt. Ltd., India 2 AMI – Smart Meters & Com munication systems Cyan Technologies UK 3 OMS – SCADA – DMS solutions ETAP US 4 MDM – Analytics – Solution Integration Enzen & Esyasoft Technologies India 5 Analytics – Forecasting – Solution Integration Esyasoft Technologies India 6 Demand Response & Transformer Management Units Ecolibrium Energy India 7 Smart Grid Control Center Esyasoft - DELL India Project Solution Partnerships
  • 26. 1. As is study of the existing system including survey of the 11 kV feeder network complete. 2. Preparation of the detailed designs and documentation for implementation complete 3. Approval of the Software Application Architecture Design and blueprint. 4. Approval of Hardware design architecture complete 5. Selection and finalization of AMI solution, including Smart Meters & Communication network solution provider. 6. Transformer Monitoring System demo units installed at site. Sample Meter units installed at site for data communication and analysis. 7. First lot of 500 smart meters will be installed by end March 2015. Present Status of the Project :
  • 27. 8. Control Center equipment such as Servers, workstations, networking equipment are being installed at “Smart Grid Control Center at CESC corporate office. 9. All applications such as : a. Meter Data Acquisition system (MDAS) b. Meter Data Management System – MDM c. Outage Management System – OMS d. SCADA – Distribution Management system e. Visualization & Data Analytics applications f. Peak Load Management g. Transformer Monitoring system h. Fault Management system i. Demand Side Management / Demand Response j. GIS application interface k. Renewables Integration monitoring application l. Billing Application interface are under development and configuration Present Status of the Project :
  • 30. CESC Corporate Office New Building – Location of SGCC
  • 31. http://122.166.217.170:8090/app/home.aspx Live application – under development, testing and deployment
  • 32. Snapshot – Live data from DTMU
  • 33. Snapshot – Load Balancing - Live data from DTMU
  • 34. Snapshot – Harmonics Distortion - Live data from DTMU
  • 35. Snapshot – Load and Temperature Live data from DTMU
  • 36. Snapshot- Meter Data from Sample Meters