MR. BATTUL Y. P. ( J.E.)
GOSIKHURD PROJECT, NAGPUR.
112/9/2019

 Introduction
 Guidelines For Planning
 Guidelines For Design
 Installation Requirements
 Example of Planning & Design Of Minor System
 Conclusion
 References
CONTENTS
12/9/2019 2

 As Per MWRD Vision 20-20, Improve The Water Use
Efficiency of Irrigation System By 20%
 Increasing Demand of Water For Civilization &
Industrialization Reduces The Water Availability For
Irrigation Purpose
 Efficiency of Canal Distribution Network Is 49.1%
 Efficiency of Pipe Distribution Network Is 66.3%
INTRODUCTION
12/9/2019 3

 Chak Size 5 To 12 Ha.
 Equitable Water Distribution & Optimum Cost
 Alignment of Main Pipe Should Be Minimum
 Layout of Lateral Serve Max Area With Min. Length
 Sub Lateral- Considering Shape & Size of Chak.
GUIDELINES FOR PLANNING
12/9/2019 4

 Velocity : 0.8-1.2 m/s
(Acceptable 0.6 m/s & Permissible 1.5 m/s)
 Min Driving Head : 1.2 m
 Effective Head : 0.6 m (Acceptable 0.3 m)
 Hf= L* (Q/CR)1.81
994.62 * D4.81
 Minor Losse : 10% of Frictional Losses
GUIDELINES FOR DESIGN
(As Per GR of GoM Dated 02-02-17)
12/9/2019 5

 Trash Screen : Restrict Entry of Debris, Floating
Matters
 Intake Chamber : To Collect Water From Main Canal
 Silt Trap : To Separate Silt Particles
 Air Valve : At every 300 m & summit location
(Diameter of Valve: 10% Dia. of Pipe)
 Anchor / Thrust Block : Change In Alignment & At
Every 200 m Interval
 Turnout : At Outlet of Lateral
 Electromagnetic Flow Meter : For Measuring Flow
INSTALLATION REQUIREMENTS
(PROVISIONS)
12/9/2019 6

 Hydraulic Testing : To Ensure Pipe Rating, Leakage-
Proof
 Sluice Valve : For Regulating flow, For Maintenance.
 Crop Compensation : Rupees 50000/ Ha.
INSTALLATION REQUIREMENTS
(PROVISIONS) CONTINUE..
12/9/2019 7

DESIGN OF PDN.xlsx
EXAMPLE OF MINOR SYSTEM
12/9/2019 8

 PDN system saves water over conventional canal
distribution network system.
 The maximum benefits of the PDN system can be
utilized if planning and design of PDN system
should be done carefully.
 When land cost is comparatively high then adoption
of PDN system is more suitable.
CONCLUSION
12/9/2019 9

 Water Resource Department, Government Of Maharashtra,
Government Resolution No.201702021324512227, Dated: 02 Feb
2017, “Guidelines Regarding Pipe Distribution System For
Irrigation Project.”
 Guidelines For And Design Of Piped Irrigation Network
(Source To Outlet), Central Water Commission, Government Of
India, New Delhi, May 2017.
 Sandesh B. Kulavmode (2017), “Guidelines For Construction
Of Pipe Distribution Network (PDN) For Irrigation”, Volume 4
IRJET.
REFERENCES
12/9/2019 10


More Related Content

PLANNING AND DESIGN OF PIPE DISTRIBUTION NETWORK (PDN).

  • 1. MR. BATTUL Y. P. ( J.E.) GOSIKHURD PROJECT, NAGPUR. 112/9/2019
  • 2.   Introduction  Guidelines For Planning  Guidelines For Design  Installation Requirements  Example of Planning & Design Of Minor System  Conclusion  References CONTENTS 12/9/2019 2
  • 3.   As Per MWRD Vision 20-20, Improve The Water Use Efficiency of Irrigation System By 20%  Increasing Demand of Water For Civilization & Industrialization Reduces The Water Availability For Irrigation Purpose  Efficiency of Canal Distribution Network Is 49.1%  Efficiency of Pipe Distribution Network Is 66.3% INTRODUCTION 12/9/2019 3
  • 4.   Chak Size 5 To 12 Ha.  Equitable Water Distribution & Optimum Cost  Alignment of Main Pipe Should Be Minimum  Layout of Lateral Serve Max Area With Min. Length  Sub Lateral- Considering Shape & Size of Chak. GUIDELINES FOR PLANNING 12/9/2019 4
  • 5.   Velocity : 0.8-1.2 m/s (Acceptable 0.6 m/s & Permissible 1.5 m/s)  Min Driving Head : 1.2 m  Effective Head : 0.6 m (Acceptable 0.3 m)  Hf= L* (Q/CR)1.81 994.62 * D4.81  Minor Losse : 10% of Frictional Losses GUIDELINES FOR DESIGN (As Per GR of GoM Dated 02-02-17) 12/9/2019 5
  • 6.   Trash Screen : Restrict Entry of Debris, Floating Matters  Intake Chamber : To Collect Water From Main Canal  Silt Trap : To Separate Silt Particles  Air Valve : At every 300 m & summit location (Diameter of Valve: 10% Dia. of Pipe)  Anchor / Thrust Block : Change In Alignment & At Every 200 m Interval  Turnout : At Outlet of Lateral  Electromagnetic Flow Meter : For Measuring Flow INSTALLATION REQUIREMENTS (PROVISIONS) 12/9/2019 6
  • 7.   Hydraulic Testing : To Ensure Pipe Rating, Leakage- Proof  Sluice Valve : For Regulating flow, For Maintenance.  Crop Compensation : Rupees 50000/ Ha. INSTALLATION REQUIREMENTS (PROVISIONS) CONTINUE.. 12/9/2019 7
  • 8.  DESIGN OF PDN.xlsx EXAMPLE OF MINOR SYSTEM 12/9/2019 8
  • 9.   PDN system saves water over conventional canal distribution network system.  The maximum benefits of the PDN system can be utilized if planning and design of PDN system should be done carefully.  When land cost is comparatively high then adoption of PDN system is more suitable. CONCLUSION 12/9/2019 9
  • 10.   Water Resource Department, Government Of Maharashtra, Government Resolution No.201702021324512227, Dated: 02 Feb 2017, “Guidelines Regarding Pipe Distribution System For Irrigation Project.”  Guidelines For And Design Of Piped Irrigation Network (Source To Outlet), Central Water Commission, Government Of India, New Delhi, May 2017.  Sandesh B. Kulavmode (2017), “Guidelines For Construction Of Pipe Distribution Network (PDN) For Irrigation”, Volume 4 IRJET. REFERENCES 12/9/2019 10
  • 11.