2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Service Solar O&M
- 3. APS solar sites under O&M
• AZ Sun – (9) utility scale sites, 170 MWAC
– Allowed by utility commission
• Schools & Government – (59), 12 MWAC
– Allowed by utility commission
• Legacy – (41), 4 MWAC
– 5 to 15 years old
• Residential – (129), 1 MWAC
– Special DOE project
- 4. Solar O&M – AZ Sun Sites
• Operations (O)
– Monitoring site: real time data, alarms, check
against estimated performance, security, 24/7
– “Smart” meter data for smaller sites
• Maintenance (M)
– PM=Preventive Maintenance
• Weekly, semi-annual, annual
– CM=Corrective Maintenance
• Equipment down, soiling, erosion
- 5. Solar O&M Options
• Utility owned sites
– Contract w/original EPC on each site for O&M
• Can be expensive over life of plant
• Multiple contracts to manage
– Contract w/one supplier on all O&M
• Problems with communications, multiple parties
• Terms of contract are critical
– In-house O&M
• Some problems w/warranty response of EPC
• Could be most cost effective
- 6. Utility Scale Solar Sites
• Biggest impacts on energy production
– Switchgear, single point of failure
• Long lead time replacements
• MV fuses, early degradation
– Inverters, most events/issues
• Could be 1% to 11% impact for 1 inverter down