SlideShare a Scribd company logo
Arizona Public Service Solar O&M
Jim Hansen
2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Service Solar O&M
APS solar sites under O&M
• AZ Sun – (9) utility scale sites, 170 MWAC
– Allowed by utility commission
• Schools & Government – (59), 12 MWAC
– Allowed by utility commission
• Legacy – (41), 4 MWAC
– 5 to 15 years old
• Residential – (129), 1 MWAC
– Special DOE project
Solar O&M – AZ Sun Sites
• Operations (O)
– Monitoring site: real time data, alarms, check
against estimated performance, security, 24/7
– “Smart” meter data for smaller sites
• Maintenance (M)
– PM=Preventive Maintenance
• Weekly, semi-annual, annual
– CM=Corrective Maintenance
• Equipment down, soiling, erosion
Solar O&M Options
• Utility owned sites
– Contract w/original EPC on each site for O&M
• Can be expensive over life of plant
• Multiple contracts to manage
– Contract w/one supplier on all O&M
• Problems with communications, multiple parties
• Terms of contract are critical
– In-house O&M
• Some problems w/warranty response of EPC
• Could be most cost effective
Utility Scale Solar Sites
• Biggest impacts on energy production
– Switchgear, single point of failure
• Long lead time replacements
• MV fuses, early degradation
– Inverters, most events/issues
• Could be 1% to 11% impact for 1 inverter down
Thank You,
any questions?

More Related Content

2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Service Solar O&M

  • 1. Arizona Public Service Solar O&M Jim Hansen
  • 3. APS solar sites under O&M • AZ Sun – (9) utility scale sites, 170 MWAC – Allowed by utility commission • Schools & Government – (59), 12 MWAC – Allowed by utility commission • Legacy – (41), 4 MWAC – 5 to 15 years old • Residential – (129), 1 MWAC – Special DOE project
  • 4. Solar O&M – AZ Sun Sites • Operations (O) – Monitoring site: real time data, alarms, check against estimated performance, security, 24/7 – “Smart” meter data for smaller sites • Maintenance (M) – PM=Preventive Maintenance • Weekly, semi-annual, annual – CM=Corrective Maintenance • Equipment down, soiling, erosion
  • 5. Solar O&M Options • Utility owned sites – Contract w/original EPC on each site for O&M • Can be expensive over life of plant • Multiple contracts to manage – Contract w/one supplier on all O&M • Problems with communications, multiple parties • Terms of contract are critical – In-house O&M • Some problems w/warranty response of EPC • Could be most cost effective
  • 6. Utility Scale Solar Sites • Biggest impacts on energy production – Switchgear, single point of failure • Long lead time replacements • MV fuses, early degradation – Inverters, most events/issues • Could be 1% to 11% impact for 1 inverter down