6

My house was built in 65 and we bought it a few years ago. I've been slowly fixing things as I can, like the giant rats nest of electrical wiring strewn about the attic :). Now I want to get to these problems my inspector showed me under the house. My uncle was giving me advice on how to fix it before he passed last year so I'm trying to figure out what to do on my own. I have reasonable woodworking, repair and tool skills but I have not done any frame level repairs before.

First up I have this center beam that looks like three pieces of wood stuck together and run along the length of the house. In two sections one of the three beams have broken. My idea was to get some long 1/4" stainless steel bolts, drill pilot holes through the beam every 18" along the broken sections and then screw them together. I'm not sure of the right type of bolts to buy though.

enter image description here

enter image description here

My second problem is a broken floor joist. I guess I could knock this out and try to replace it? Or maybe just sister another piece of wood to it? I remember my uncle mentioning using a floor jack to raise it back into place and then doing something.

enter image description here

Finally, the beam rests on these old masonry shims. The advice I got was to replace them with metal shims. I can measure the spacing with calipers and find the right size metal plates to go in here. But then I'm not sure how to replace the old ones. Do I raise up the beam a little with a jack and slip them in? Or do I try to hammer the new ones through the old ones? Or do I stop thinking about this part of the repair and just call someone :)

shims enter image description here

more shims enter image description here

Thanks for any advice!

-----Edit: adding text from the inspection report

The lower support frame consists of 2x10" floor joists and 6x10” main support beams supported by a series of concrete block piers on independent footings, which is good, solid and more than adequate construction for a 1 level structure.

Deflection of the joists in the center main beam was noted at the center left and center right main beams, with splits at the center joist of the 3-joist beam that caused the deflection (spread between the joists due to dry wood, loose nails and load stress). The deflection is approximately 3/8 ”. This can cause deviations in the upper frame and cracks in walls, floor and door frames and cause doors to stick or not latch. It is recommended to install 1⁄4” through bolts with washers and lock nuts staggered every 18” along the beam to prevent further movement and stabilize the beam. There is also a split floor joist at the front left crawlspace floor frame, which need to be reinforced. A qualified frame contractor should be consulted on these matters for further evaluation and an estimate of repairs.

The main beams are improperly shimmed at the piers using masonry shims that only partially support the beams on the surface of the piers; this can cause movement and deflection and subsequent upper frame movement (see interior notes). A qualified frame contractor should be called to install full sized masonry or metal shims to support the beam across the full surface of the piers to prevent further gradual deflection and movement.

There were no other structurally significant findings observed at the lower support frame.

11
  • 1
    1) It is a defect on the wood beam rather than a crack. 2) The splitting joist near the bearing is not a good phenomenon, it needs special attention to determine the cause. 3) If things aren't broken, why mess with them?!
    – r13
    Commented Dec 26, 2021 at 21:31
  • 1
    What, specifically, did the inspector say about the defects in the 3 ply beam? From here, they don’t look like anything worthy of repair. Commented Dec 26, 2021 at 21:42
  • 3
    Have you noticed sagging floors over these beams? If so, how much over how large an area?
    – Lee Sam
    Commented Dec 26, 2021 at 23:47
  • 3
    While the report doesn't sound alarming but did address some defects that deserve attention. I suggest doing exactly as suggested - bring in a trustworthy contractor to go over the report, and make suggestions and work plan. I think you are correct in taking preventive action, but please don't do it yourself. Good luck.
    – r13
    Commented Dec 27, 2021 at 3:02
  • 3
    By the way, the good news is that the defects were not caused by under-design, defective foundation, or poor workmanship. So proceed to get them fixed, but relax.
    – r13
    Commented Dec 27, 2021 at 3:13

4 Answers 4

2

You do not need a professional. And that's coming from one.

Issues

  1. I don't believe you really have a problem there. I don't know your span of joists but that trip beam looks fine to me. If it seems like it's not nailed together well (that's key when building up a beam) then maybe the bolts idea would work. Use a fender or other oversized washers if possible. You could even simply throw more 16p in there. In either method, it works best to squeeze (clamp) the beam together before and near the nailing point. Then move the clamp and do it again.

  2. The only problem here is it might squeak. I cannot see the joist spacing but it's unlikely this will cause any issues of dipped floor, unless you know that's the case now. It's been that way for quite some time. This is just a defect in the wood joist due to the location of that knot. Get some Simpson strapping that will wrap all the way down one side, across the bottom, and back up the other. Squeeze as much Titebond into the crack as you can, jack (clamp, pound a temp bit-too-long upright 2x4 with plywood base up under it, or whatever works to bring the break into place). Apply the strapping. For good measure, pre-drill and install a couple of 4" or so screws up from the bottom. Since your temp support might be in the way, you could use the screws and glue only and then once support is removed, apply the strapping for extra strength.

  3. Get a pack of cedar shims and slide in shims (wedges stacked and going opposite directions) on both sides of the masonry shims. Pound them in tight. You're adding your own shims here that will work independently from the masonry shims. Add two sets on each side if it makes you feel better. The shims will not loosen up or come out later on their own so you need not fasten them in any way, but again, if it makes you feel better, then silicone caulk the edges to the conc block some to hold them from potentially moving later when a mouse tries to pull them out. Jk. Clean masonry column tops a bit first so silicone can stick. You could use construction adhesive too.

And I'll probably get flagged for off-topic but in real life something you see sometimes brings up something you should say: your biggest problem under there is not that framing, but your lack of ground cover. This is adding a moisture load to your home at the very least and on the worse end, other soil gasses such as radon. The second biggest problem is the lack of perimeter insulation. I'm talking about min R15 (solid foam) or R19 (fluffy stuff) from the bottom of plywood in the rim joist to the crawl floor. Caulk seal the rim joist before you insulate.

0

The cracks that you’ve photographed are called “checking.” The checks are accounted for by material specifiers and building designers. The concrete blocks can settle a bit, especially if the ground wasn’t compacted. I would stretch a string end-to-end along the bottom of the three-joist beam. If the beam has settled a bit, I’d shim it back up. A regular hydraulic car jack works well. Plywood makes good shims.

0

ok, sounds like your inspection is over and you can repair yourself if able.

1st pic: does not need alarm. simple or no repair. if, you can not sleep, then put 1/4" steel plate in 1/4" deep router slot area. drill and bolt to other side joists. run new 2x12 (if thats it) from one post to the other, over half way, on both posts. do this on both sides. then run 4" screws to hold it in place, both sides. then drill holes through, one up, one down, 5" apart vertical and 12" or 16" parallel in pairs now. lockwashers, long bolts... you get the idea. 2nd pic: same, post to post. before you tighten bolts, use a go bar, or car jack with long stick, and push that split up unto place with glue. then tighten bolts and let glue dry.

3rd pic: use car floor jack to lift floor. then use anything, but make sure its completely under the joist. all sides! if you want to spend to time, you can push the house unto place, level and plumb as possible. they also have permanent floor jacks. Amazon. don't worry, it just has to hold the house up! don't launch any high powered rockets though. research from my past fixer uppers. (real dumps).

-2

I would just add supports where I could like where a beam is split or cracked or two beam butt up together and not sitting straight add a brace and a footer if there's room, a bottle neck jack to just lift up enough to make a footer load bearing I wouldn't jack up to much because houses settle and if you tweak one end something is tweaking at the other end could also could add cross beams for more spread out support if you was trying to get level a laser would make it easy on u I read something in an answer said if things aren't broken why fix them or mess with them or something like that, there's something called preventative maintenance if you can see an issue that you know something going to happen and you can do something to prevent it you just prevented something from breaking, I think the phrase if it's not broke don't fix it refers to just taking apart stuff for the heck of it

2
  • 4
    I'd complain that this is one run-on sentence, but there isn't even a period, question mark or exclamation mark at the end to finish it as a sentence. Please edit your answer to make it more readable. Good communication can be difficult, but that's not an excuse not to try. Take a look at the How to Answer Guidelines for some tips, and take the tour, as well. They'll help you get the most out of this site.
    – FreeMan
    Commented Jan 10, 2023 at 13:05
  • Ture .true were hair to learn together! I'll ride the tour they'll help me answer guidelines to some tips and edit how to answer good communication and clarification at end to finish sentence so my answers more readable for everyone on taking the tour can understand me better Commented Jul 15, 2023 at 8:54

Not the answer you're looking for? Browse other questions tagged or ask your own question.