I was tracking flight NKS739 from LAX to SEA this morning and saw that it made some some odd turns. If you look at the track from FlightRadar24.com you can see that it was heading toward SEA then it took a large turn to the right then to the left then returned to its original course.

FlightRadar24 screenshot showing Spirit Airlines flight NK739 flying in a zizgag some 400 km before its destination of Seattle and then flying in a mostly straight line again afterwards.

This does not look like the usual technical glitch from Flightradar24, and FlightAware shows the same track. There was no weather anywhere in the area. There were many aircraft in the area at the time and none of them made any unusual turns. There are no MOA's in the area (most of it is over a national forest) and none of the other aircraft seem to be avoiding anything in the area. I tried to see if LiveATC.net had a recording but that's Seattle center's area and they don't appear to have a feed for ZSE.

I can't come up with any reason for such an odd deviation. The aircraft arrived in SEA and there didn't seem to be any problem. It immediately turned around and made another flight which was uneventful.

Is there anything that might explain this deviation? Is it just a glitch?

$\endgroup$
3
  • $\begingroup$ Thunderstorm??? $\endgroup$ Commented Jul 5, 2016 at 22:36
  • 2
    $\begingroup$ @user3344003 There was no weather anywhere around. $\endgroup$
    – TomMcW
    Commented Jul 5, 2016 at 22:37
  • $\begingroup$ This comment is unavailable for legal reasons. $\endgroup$ Commented Dec 31, 2016 at 20:29

3 Answers 3

141
$\begingroup$

Alrighty then, that took some detective work.

Here's another flight around the same time, SkyWest 4458, which arrived 2 minutes later. Notice it's one deviation, compared to two deviations in your example.

enter image description here

Weather seemed fine, but KSEA has TBFM (Time Based Flow Management) since Aug 2013. If the ATC asks a plane to delay its arrival time, the way it's done is to deviate from the route, then get back on it again—that's if slowing down alone won't meet the time target.

Pilots then use the RTA (Required Time of Arrival) function of the FMC. Initially the function was rarely used, but now with NextGen in the U.S., SESAR in Europe, and similar systems elsewhere, it is frequently used.

It can be arranged way ahead of the airport, i.e., it can be ordered by the approach controller, yet the center controller of another ARTCC delivers the message.

It looks exactly like that. Deviate, if not enough, deviate the other way.

Behind the Scenes

The system is called ERAM (En-Route Automation Modernization).

ERAM detects future conflicts, and based on that, traffic is asked to speed up, slow down, or deviate to slow down further. It reduces/eliminates hold time.

Europe—the first to use it in 2012—refers to it as initial 4D trajectory management. Planes arrive at waypoints at agreed times.

For whatever reason—most probably sudden traffic influx—they were asked to slow down.


The difference between this, and the regular vectoring/doglegging in the terminal area, is the way it is predicted, coordinated, and then relayed to airplanes far from the airport.

Below you can see as the jet turned, it slowed down as well. The initial upward spike is just the tailwind when the plane turned.

enter image description here

Source: flightradar24.com

$\endgroup$
12
  • 7
    $\begingroup$ Forgive me for being a total layperson, but why wouldn't the plane just slow down? $\endgroup$ Commented Jul 5, 2016 at 11:35
  • 2
    $\begingroup$ @user1717828 speed control works, but it has its limitations. see the other answer. $\endgroup$
    – DeltaLima
    Commented Jul 5, 2016 at 12:18
  • 5
    $\begingroup$ Would it be safe to think of the path of the plane like a rope, and a holding pattern like stretching the rope tight and coiling the rest outside the city. This is saying "hey I know how long the rope has to be, and since we don't want too many coils outside the city, we're going to slack some back along the route" - is that fair? $\endgroup$
    – corsiKa
    Commented Jul 5, 2016 at 16:51
  • 4
    $\begingroup$ @ymb1 So is it possible those coming from the south had a tailwind that sped them up, so they had to deviate to make up for their efficiency? (Man, 'make up for their efficiency' is the most disheartening phrase I've used in a while...) $\endgroup$
    – corsiKa
    Commented Jul 5, 2016 at 20:21
  • 5
    $\begingroup$ @user1717828 As altitude increases, the minimum (stall) speed increases too. U-2 is shocking example of this: at altitude it's stall speed rises so much that it's just 10 knots (18 km/h) slower than never-exceed speed. So near the ground U-2 can fly as slow as 140km/h, but at altitude it can't go slower than 780 km/h! Civilian airliners don't fly as high, but still, takeoff speed of an A320 is 150 knots while best guesstimate I could find of min speed at max altitude is around 250 knots. That's over half of it's top speed. $\endgroup$
    – Agent_L
    Commented Jul 6, 2016 at 15:58
90
$\begingroup$

It is a typical dogleg used to increase spacing between aircraft or delay their arrival. If the airport does not have enough capacity to handle incoming traffic, the air traffic controllers have basically two options to delay arriving aircraft:

  • reduce their speed
  • increase their path length

Speed reduction works, but only when the distance to travel is still long. And even then it can only absorb a few minutes as the minimum speed of aircraft is still quite high. At very low speeds the fuel consumption increases drastically, making slow flight unattractive.

Increase of path length is more versatile, it allows for much more time to be added to the flight (fuel is the limiting factor). Basically two types of path lengthening are used: holding patterns and dog legs. In a holding pattern, ATC can stack multiple aircraft on top of each other. A full circuit in a holding pattern takes about 5 minutes so it is a way of absorbing much delay.

When not so much delay is needed, the dog-leg is preferred. By vectoring the aircraft 30 - 60 degrees off-course and then back to the original track, the controller can accurately control the delay and spacing between aircraft. This is used in the initial approach phase and when vectoring to the final approach. Often it is used in combination with speed control; slow flight reduces the size of the dog-leg. However, airlines prefer to fly the optimum endurance speed during such a phase to minimize fuel consumption.

In case of the flight you were tracking, the aircraft was vectored right of its track, then back to cross to the left of its original track and finally back onto the original track. The added distance was approximately 65 nautical miles, which would be about 11 minutes extra flying time.

$\endgroup$
21
$\begingroup$

DeltaLima hits the mark. I used to work there. Undoubtedly traffic management delays going on for some reason, either too much traffic or reduced runway capacity. TBFM issued directly to the aircraft is still in the early stages. I believe most delays are managed by the controllers vectoring, holding or issuing speeds. BTW- speeds are only effective for absorbing very small delays because it takes too much time to work. Old ATC rule; use vectors to get your spacing, speed to keep it.

The "dog leg" vectoring going on looks like it's occurring in the second tier sector, sector 46 (two sectors away from the approach control boundary). The first tier sector may have been at capacity forcing the delays to be pushed out to the high altitude sectors.

FYI - we used to figure about 5 minutes for one turn in hold. Holding needs to be handled at lower altitudes just to keep the plane in the box. I saw someone issue a hold to a 747 at FL390 once and it took the better part of the state to complete one turn!

$\endgroup$
4
  • 2
    $\begingroup$ Hello Iain, welcome to Aviation.SE! Are you a former Air Traffic Controller or still active? I've updated my answer to reflect your rule of thumb for 5 minutes per turn in the hold. $\endgroup$
    – DeltaLima
    Commented Jul 8, 2016 at 16:19
  • $\begingroup$ Welcome to the site! Hope you stop in often. Always nice to hear from an ATC. We've got lots of pilots but few controllers and we get a lot of ATC related questions. $\endgroup$
    – TomMcW
    Commented Jul 8, 2016 at 18:57
  • 4
    $\begingroup$ Former controller/traffic management and supervisor at ZSE. Retired 2010. The mentions of ERAM give me chills...4 years working to get that beast presentable was hell on the LM engineers and the controllers trying to make it work. $\endgroup$
    – Iain
    Commented Jul 9, 2016 at 5:25
  • $\begingroup$ Oh and... Thanks! Good questions here from serious fans of aviation. Good site! $\endgroup$
    – Iain
    Commented Jul 9, 2016 at 5:36

You must log in to answer this question.

Not the answer you're looking for? Browse other questions tagged .