Eddie Giese, PE

Lithia, Florida, United States Contact Info
917 followers 500+ connections

Join to view profile

About

I'm a lifelong learner who believes people are the most important asset any company could…

Activity

Join now to see all activity

Experience & Education

  • Patel, Greene & Associates, LLC (PGA)

View Eddie’s full experience

See their title, tenure and more.

or

By clicking Continue to join or sign in, you agree to LinkedIn’s User Agreement, Privacy Policy, and Cookie Policy.

Licenses & Certifications

Volunteer Experience

Projects

  • SR A1A Mid-Block Crossing - 2nd Ave N (441194-2)

    -

    Deputy Project Manager & Roadway EOR: This project provided design to improve safety conditions for pedestrians along 2nd Ave N by installing mid-block crosswalks with ADA-compliant concrete curb ramps and pedestrian hybrid beacons. PGA was the prime consultant leading the signals, lighting, signing and marking, roadway, and structures efforts. The curb bulb-outs required careful detail modeling to ensure positive drainage while balancing the needs of pedestrians and vehicular traffic alike.

  • SR A1A Mid-Block Crossing - Bay St and 15th Ave N (441194-1)

    -

    Deputy Project Manager & Roadway EOR. This project provided design to improve safety conditions for pedestrians at the intersections of SR A1A and Bay St and 15th Ave N by installing mid-block crosswalks with ADA-compliant concrete curb ramps and Pedestrian Hybrid Beacons (PHBs). PGA was the prime consultant leading the signals, lighting, signing and marking, roadway, and structures efforts. The curb bulb-outs required careful detail modeling to ensure positive drainage while balancing the…

    Deputy Project Manager & Roadway EOR. This project provided design to improve safety conditions for pedestrians at the intersections of SR A1A and Bay St and 15th Ave N by installing mid-block crosswalks with ADA-compliant concrete curb ramps and Pedestrian Hybrid Beacons (PHBs). PGA was the prime consultant leading the signals, lighting, signing and marking, roadway, and structures efforts. The curb bulb-outs required careful detail modeling to ensure positive drainage while balancing the needs of pedestrians and vehicular traffic alike.

  • SR 115 Sec 02M - SR 115 Widening and Intersection Improvements (PennDOT District 5-0)

    -

    2022 ACEC/PA Diamond Award for Engineering Excellence. Served as Assistant Project Manager and Lead Project Highway and Traffic Engineer for this widening and intersection improvement project on SR 0115 from SR 0903 to the Pocono Raceway. Responsibilities included preliminary and final design for the improvements including highway design, E&S pollution control, stormwater management, utility clearance, right-of-way plans for 34 parcels, traffic control, bid documents, and construction…

    2022 ACEC/PA Diamond Award for Engineering Excellence. Served as Assistant Project Manager and Lead Project Highway and Traffic Engineer for this widening and intersection improvement project on SR 0115 from SR 0903 to the Pocono Raceway. Responsibilities included preliminary and final design for the improvements including highway design, E&S pollution control, stormwater management, utility clearance, right-of-way plans for 34 parcels, traffic control, bid documents, and construction consultation. Responsible for developing project scope, tracking project budget and developing and maintaining the design schedule.

  • A-095.00R Resurfacing and Bridge Repairs (Pennsylvania Turnpike)

    -

    Served as Project Manager for this 6-mile-long resurfacing and bridge repair project along the Northeast Extension of the Turnpike. Management responsibilities included monitoring and developing project schedule, maintaining project budget, and managing multiple subconsultants. Design responsibilities included developing horizontal and vertical geometry, typical section and detail development, maintenance and protection of traffic, E&S control design, and developing the final construction plan…

    Served as Project Manager for this 6-mile-long resurfacing and bridge repair project along the Northeast Extension of the Turnpike. Management responsibilities included monitoring and developing project schedule, maintaining project budget, and managing multiple subconsultants. Design responsibilities included developing horizontal and vertical geometry, typical section and detail development, maintenance and protection of traffic, E&S control design, and developing the final construction plan set. Additional project tasks included tabulating quantities, preparing engineer's estimates, developing special provisions, creating pre-bid construction scheduling, and assembling the PS&E package.

  • T-299.00R Resurfacing and Median Barrier Replacement (Pennsylvania Turnpike)

    -

    Served as Project Manager for this 7-mile-long resurfacing project along the Turnpike mainline. Management responsibilities included monitoring and developing project schedule, maintaining project budget, and managing multiple subconsultants. Design responsibilities included developing horizontal and vertical geometry, typical section and detail development, maintenance and protection of traffic, E&S control design, and developing the final construction plan set. Additional project tasks…

    Served as Project Manager for this 7-mile-long resurfacing project along the Turnpike mainline. Management responsibilities included monitoring and developing project schedule, maintaining project budget, and managing multiple subconsultants. Design responsibilities included developing horizontal and vertical geometry, typical section and detail development, maintenance and protection of traffic, E&S control design, and developing the final construction plan set. Additional project tasks included tabulating quantities, preparing engineer's estimates, developing special provisions, creating pre-bid construction scheduling, and assembling the PS&E package.

  • T-286.09R Concrete Pavement Repairs (Pennsylvania Turnpike)

    -

    Served as Project Manager and Lead Highway and Traffic Engineer for this concrete interchange maintenance and preservation project. The scope of work involved extensive concrete pavement repairs at the Reading Interchange on either side of the existing toll plaza, bituminous resurfacing of ramps, areas of reconstruction east of the toll plaza, slope erosion mitigation, guide sign design and replacement on- and off-site, inlet repairs, bridge deck patching, and guardrail upgrades.

  • A-115.00R Resurfacing (Pennsylvania Turnpike)

    -

    Served as Project Engineer for this 5-mile-long resurfacing project along the Northeast Extension of the Turnpike. Management responsibilities included monitoring and developing project schedule, maintaining project budget, and managing multiple subconsultants. Design responsibilities included developing horizontal and vertical geometry, typical section and detail development, maintenance and protection of traffic, E&S control design, and developing the final construction plan set. Additional…

    Served as Project Engineer for this 5-mile-long resurfacing project along the Northeast Extension of the Turnpike. Management responsibilities included monitoring and developing project schedule, maintaining project budget, and managing multiple subconsultants. Design responsibilities included developing horizontal and vertical geometry, typical section and detail development, maintenance and protection of traffic, E&S control design, and developing the final construction plan set. Additional project tasks included tabulating quantities, preparing engineer's estimates, developing special provisions, creating pre-bid construction scheduling, and assembling the PS&E package.

  • SR 2003 Sec 02B - Bridge Replacement over Pine Creek (PennDOT District 5-0)

    -

    Served as Project Manager and Project Engineer for Final Design of this bridge replacement project. Responsibilities included final design for the improvements including highway design, utility clearance, right-of-way plans, traffic control, bid documents, and construction consultation. Responsible for tracking project budget and developing and maintaining the design schedule. The project successfully completed the bidding process without any questions from contractors and had zero…

    Served as Project Manager and Project Engineer for Final Design of this bridge replacement project. Responsibilities included final design for the improvements including highway design, utility clearance, right-of-way plans, traffic control, bid documents, and construction consultation. Responsible for tracking project budget and developing and maintaining the design schedule. The project successfully completed the bidding process without any questions from contractors and had zero non-administrative addenda.

  • EB-306 Bridge Replacement, Nissley Drive over PA Turnpike (PTC)

    -

    Served as Lead Highway Engineer for this bridge replacement and roadway realignment project. The focus of the replacement was to correct the substandard vertical clearance while designing for the total reconstruction of the Turnpike mainline. To minimize impacts to a neighboring daycare facility, the project included realignment of Nissley Drive to the west. Coordinated with the Township for multiple alternatives to realign Nissley Drive. Responsibilities included developing and maintaining the…

    Served as Lead Highway Engineer for this bridge replacement and roadway realignment project. The focus of the replacement was to correct the substandard vertical clearance while designing for the total reconstruction of the Turnpike mainline. To minimize impacts to a neighboring daycare facility, the project included realignment of Nissley Drive to the west. Coordinated with the Township for multiple alternatives to realign Nissley Drive. Responsibilities included developing and maintaining the design schedule, tracking the budget, and coordinating with PTC and subconsultants. Additional design responsibilities included horizontal and vertical geometry, right-of-way planning and design, maintenance and protection of traffic, stormwater analysis and design, conceptual E&S control, design field view plans, utility clearance, and bid documents. Provided construction consultation services and coordinated the Notice of Termination for the NPDES permit.

  • Guardrail Inventory and Risk Assessment Program (FHWA)

    -

    Blue Ridge Parkway, Shenandoah, Delaware Water Gap, Gateway, Suitland Parkway, and Baltimore Washington Parkway National Parks, Multiple States.
    Performed kickoff conference calls and meetings with park personnel to explain guardrail and wall inventory process. Coordinated traffic control with contractor and park using the Manual on Uniform Traffic Control Devices standards and local restrictions. Performed inventory and risk assessment evaluating existing barriers’ crashworthiness…

    Blue Ridge Parkway, Shenandoah, Delaware Water Gap, Gateway, Suitland Parkway, and Baltimore Washington Parkway National Parks, Multiple States.
    Performed kickoff conference calls and meetings with park personnel to explain guardrail and wall inventory process. Coordinated traffic control with contractor and park using the Manual on Uniform Traffic Control Devices standards and local restrictions. Performed inventory and risk assessment evaluating existing barriers’ crashworthiness, compliance with design standards, and condition. Prepared work order for each barrier that had substandard conditions, while balancing the cultural and historical significance of the barrier.

  • I-75 from North of SR 80 to South of SR 78 (FDOT District 1)

    -

    Prepared and used design criteria report. Performed horizontal design of widening of interstate to eight lanes (interim project) including roadside design and ramp tie-ins. Responsible for horizontal geometry design for transition to adjacent projects with different lane configurations (interim and ultimate projects), ramp realignments, and widenings. Completed design of typical sections for eight-lane and ten-lane configurations. Provided plans production including cross sections, plan sheets,…

    Prepared and used design criteria report. Performed horizontal design of widening of interstate to eight lanes (interim project) including roadside design and ramp tie-ins. Responsible for horizontal geometry design for transition to adjacent projects with different lane configurations (interim and ultimate projects), ramp realignments, and widenings. Completed design of typical sections for eight-lane and ten-lane configurations. Provided plans production including cross sections, plan sheets, and profile sheets. Performed quantity calculations for roadway items and preliminary cost estimates.

  • I-4/Lee Roy Selmon Expressway Connector Interchange (FDOT District 7 & THEA)

    -

    Performed preliminary horizontal design of 39th Street intersection and assisted with cross section development and production. Identified and prepared critical sections for maintenance of traffic. Prepared maintenance of traffic overview sheets depicting staged construction of bridge deck replacements, bridge widening, new ramp construction, and mainline widening. Performed horizontal design of maintenance of traffic on mainline expressway for four bid alternatives. Assisted with vertical and…

    Performed preliminary horizontal design of 39th Street intersection and assisted with cross section development and production. Identified and prepared critical sections for maintenance of traffic. Prepared maintenance of traffic overview sheets depicting staged construction of bridge deck replacements, bridge widening, new ramp construction, and mainline widening. Performed horizontal design of maintenance of traffic on mainline expressway for four bid alternatives. Assisted with vertical and horizontal design of two temporary diversions using temporary alignments and profiles. Prepared cross sections for temporary diversions. Designed advance-warning sign diagrams for various staging scenarios during maintenance of traffic. Prepared horizontal design and plans for maintenance of traffic during side street reconstructions throughout the interchange. Assisted with preparation of temporary drainage design. Performed and assisted with design and production of detour plans for various road closures as well as quantity calculations for maintenance of traffic items including temporary embankment, temporary pavement, temporary signing, temporary pavement markings, barricades, lights, and temporary drainage items. Assisted with calculation of roadway quantities and preparation of computation books for four bid alternatives.

    See project
  • Honore Avenue and Pinebrook Road Extension (Sarasota County, FL)

    -

    Prepared and used design criteria report. Responsible for design of horizontal and vertical geometry of new alignment; four-lane divided typical section; horizontal and vertical geometry of new intersection with SR 0681; and plan production including cross sections, plan and profile sheets, curb return profiles, pond and floodplain site plans and cross sections. Assisted with the development of drainage plans including canal realignment.

  • SR 0060/Courtney Campbell Causeway (Tampa Airport) Interchange (FDOT District 7)

    -

    Attended weekly meetings with construction and engineering inspector and contractor personnel regarding post-design and revision needs. Performed and coordinated post-design tasks within tight schedule constraints. Prepared alternative design solutions for guardrail and pipe conflicts. Determined grades and elevations every 20 feet along each of the two dozen MSE retaining walls for verification purposes and to assist the contractor.

Languages

  • English

    -

Organizations

  • American Council of Engineering Companies

    -

    - Present
  • American Society of Highway Engineers

    -

    - Present

More activity by Eddie

View Eddie’s full profile

  • See who you know in common
  • Get introduced
  • Contact Eddie directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Add new skills with these courses