  • Pavilion Lab Decompression

    - Present

    Decompression of existing lab by relocating the blood bank and expanding chemistry. The existing blood bank will be expanded to enlarge the lab. New casework for the chemistry department, relocate equipment into expanded chemistry lab. Remodel break room, offices, storage room and relocate to allow for relocation of blood bank.

  • • Motion Picture and Television Hospital Remodel for Psychiatric unit and voluntary seismic improvements at wing K

    - Present

    Interior demolition, seismic retrofit, remodel interiors, and construction of new exam rooms, patent rooms, reception area, nurse station, and other support areas. Remodel existing plumbing systems, fire suppression system, HVAC, med gas, electrical, low voltage systems, fire Alarm Systems, nurse call, security, and ADA upgrades. Approx. 4.6M in Progress.

  • • Arrowhead Regional Medical Center- Pharmacy IV USP 797 Upgrades.

    The scope of work for this project was to implement the recommended improvements for compliance with USP797 as documented in a “Due Diligence Report.” Create a separate anteroom of at least ISO Class 7 air quality or ante-area providing at least ISO Class 8 air quality within the existing Pharmacy IV. Create separate clean room environments meeting ISO Class 5 for ingredients for CSPs for storage of devices and components used to prepare, package and transfer CSPs that provide opportunity to…

    The scope of work for this project was to implement the recommended improvements for compliance with USP797 as documented in a “Due Diligence Report.” Create a separate anteroom of at least ISO Class 7 air quality or ante-area providing at least ISO Class 8 air quality within the existing Pharmacy IV. Create separate clean room environments meeting ISO Class 5 for ingredients for CSPs for storage of devices and components used to prepare, package and transfer CSPs that provide opportunity to exposure to contamination, within the existing Pharmacy IV. Create two new air conditioning zones to meet the air change requirements for an ISO Class 7 environment. Implement the additional mechanical and electrical requirements recommended in the Due Diligence Report. Approx. 500K Completion April 2013.

  • University of California, Irvine Medical Center

    - Present

    Interior demolition, remodel interiors, and construction of new exam rooms, work rooms, Reception area, nurse station, and other support areas. Remodel existing plumbing systems, Fire Suppression system, HVAC, electrical, low voltage systems, fire Alarm Systems, Nurse Call, security, and ADA upgrades. Approx. 500K Completion September 2012.

  • West Covina DMV

    Removal of an existing HVAC system and abatement building materials containing limited amounts of asbestos. Oversee the installation of multiple HVAC units, an energy management system, concrete work, interior lighting renovation, and ceiling construction. Approx. 1.2M Completion January 2012.

  • Centennial High School Storage and Restroom Building. Corona, CA

    Demolition of existing irrigation system and underground piping; landscape, irrigation, and site drainage; removal, relocation and installation of new chain link fencing and gates; buildup of masonry block building including subterranean foundations, and standing seam roof; construction of new sidewalks; toilet compartments and accessories; and install all on and offsite new water services piping, and finishes. Re-routing and re-installation of all electrical systems. Approx. $1.2M Completion…

    Demolition of existing irrigation system and underground piping; landscape, irrigation, and site drainage; removal, relocation and installation of new chain link fencing and gates; buildup of masonry block building including subterranean foundations, and standing seam roof; construction of new sidewalks; toilet compartments and accessories; and install all on and offsite new water services piping, and finishes. Re-routing and re-installation of all electrical systems. Approx. $1.2M Completion June 2011.

  • Interior Renovation of Special Education Facility at Norte Vista High School

    Demolition of carpet, sheet vinyl, casework, toilet partitions, ceilings, and light fixtures. Oversee the installation of new interior finishes including carpet, sheet vinyl, base, and paint. The
    Installation of new plastic laminate, casework, and modifications of existing casework.
    Installation of new toilet partitions and toilet accessories; installation of new lighting and electrical work; installation of new aluminum storefront and automatic entrance doors; and installation of new…

    Demolition of carpet, sheet vinyl, casework, toilet partitions, ceilings, and light fixtures. Oversee the installation of new interior finishes including carpet, sheet vinyl, base, and paint. The
    Installation of new plastic laminate, casework, and modifications of existing casework.
    Installation of new toilet partitions and toilet accessories; installation of new lighting and electrical work; installation of new aluminum storefront and automatic entrance doors; and installation of new food service equipment, including difficult utility connections. Approx. $500K Completion Date January 2011.


  • Blue sky meadows dormitory

    Ground up Construction of two 3500 S.F. dorms. This included site sewer and water, radiant floor heating, high end finish work. Approx. 1M Completion August 2010.

  • Foot Bridge rehabilitation

    This job included rehabilitating a 200’ long foot bridge that was suspended over a wash. It was highly challenging and required outside the box thinking. Approx. 750K Completion June 2009.

  • Heart and Home Remodel

    Remodel of 30 separate sleeping cabins, this included electrical, plumbing, cabinetry, interior and exterior siding and paint. All work was self-performed. Approx. 1.5M Completion June 2008.

  • OR 5 Remodel

    -

    Enlarge operating room #5 by removing the sub sterile room to accommodate Da Vinci robot.

  • KRONOS Time Clock Relocation

    -

    Relocate KRONOS clocks throughout pavilion and tower 1.

  • Ferroguard Installation

    -

    Installation of magnetic Detection system (FERROGUARD) for three MRI locations on the Mission Hospital Campus.

  • Fourth Floor Nurses Station Casework Remodel

    -

    Existing nurses station to receive glass from the upper transaction counter to the underside of the soffit above.

  • Mission Hospital Cath Lab 1 & 3

    -

    Enlargement of Cath Lab's 1&3 to accommodate new Philips equipment. New casework, flooring, doors, frames and finishes.

  • 5 Package Unit Replacment Project

    -

    Replacement of three AC units and two air handlers on the roof of the hospital.

  • Sterilizer Booster Pumps

    -

    Install two new booster pumps for increasing the hot water temperature for two existing sterilizers in the surgery department soiled workroom.

  • NEUROSCIENCE AND SPINE INSTITUTE

    -

    Groundbreaking for Mission Hospital, 15,000 square foot new Neuroscience treatment center. The client's goal for the project is to provide the most advanced care in the diagnosis and treatment of neurological diseases of the brain and spine. The Institute features three state-of-the-art Neurosurgical suites and supporting infrastructure. 7M

  • Center for a Healthy Community, El Proyecto Del Barrio

    -

    Interior Remodel at 3rd Floor of existing Medical Facility – Winnetka, CA. Remodel of approximately 8,000 square foot OB-GYN Out-Patient Medical Facility including new exam rooms, reception area, and nurse stations. Work to include demolition of 3rd Floor infrastructure; upgrade of ADA handicap ramps; framing , drywall, plumbing, electrical, remove and replace HVAC system, fire alarm and fire sprinkler system, nurse call, low voltage.

More activity by Cody

View Cody’s full profile

  • See who you know in common
  • Get introduced
  • Contact Cody directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Add new skills with these courses