Skip to content

Latest commit

 

History

History
28 lines (19 loc) · 1.06 KB

pull_request_template.md

File metadata and controls

28 lines (19 loc) · 1.06 KB

References:

Jira: MNTOR- Figma:

Description

Screenshot (if applicable)

Not applicable.

How to test

Checklist (Definition of Done)

  • Localization strings (if needed) have been added.
  • Commits in this PR are minimal and have descriptive commit messages.
  • I've added or updated the relevant sections in readme and/or code comments
  • I've added a unit test to test for potential regressions of this bug.
  • If this PR implements a feature flag or experimentation, the Ship Behind Feature Flag status in Jira has been set
  • Product Owner accepted the User Story (demo of functionality completed) or waived the privilege.
  • All acceptance criteria are met.
  • Jira ticket has been updated (if needed) to match changes made during the development process.
  • Jira ticket has been updated (if needed) with suggestions for QA when this PR is deployed to stage.