Timeline for Tolerance of board-to-board headers
Current License: CC BY-SA 4.0
18 events
when toggle format | what | by | license | comment | |
---|---|---|---|---|---|
Feb 13 at 11:29 | vote | accept | Eng Sam | ||
Feb 12 at 10:17 | comment | added | Eng Sam | @AndrewMorton , I am trying currently to make them 3 connectors and use ribbon cables as this sounds the easiest solution | |
Feb 11 at 0:29 | history | became hot network question | |||
Feb 10 at 22:20 | answer | added | DKNguyen | timeline score: 3 | |
Feb 10 at 20:22 | answer | added | Voltage Spike♦ | timeline score: 3 | |
Feb 10 at 18:33 | answer | added | Fredled | timeline score: 1 | |
Feb 10 at 18:16 | comment | added | Andrew Morton | @EngSam Could there be just two connectors per board, with two cables, or would it be too difficult to reach in to attach the cables? | |
Feb 10 at 18:14 | comment | added | Andrew Morton | @DavideAndrea Yes, a connector on each board with one cable between them. Although it now appears that a single cable would not suffice due to the connector locations on the PCBs. | |
Feb 10 at 17:56 | answer | added | Kuba hasn't forgotten Monica | timeline score: 3 | |
Feb 10 at 17:35 | comment | added | Eng Sam | @DavideAndrea , I cannot use a cable since some connections are in the middle of the board and cannot be routed to the edge , and managing 20 cables is a mess. | |
Feb 10 at 17:34 | comment | added | Eng Sam | @AndrewMorton , actually there is only 40 connections ( gate - source for transistors ) , but i use 2x2 , since I think this is the smallest size that can hold itself in place in SMD. | |
Feb 10 at 17:33 | comment | added | Eng Sam | @Andyaka , I meant the only option is smd , since IMS cannot have TH components . | |
Feb 10 at 17:15 | comment | added | Andy aka | Why is the only option on one of the PCBs SMD headers? | |
Feb 10 at 17:14 | comment | added | Davide Andrea | "with a cable beween". 80 cables sounds complex and expensive. If you mean a single cable, then there's no longer an issue of alignment. | |
Feb 10 at 17:05 | answer | added | Davide Andrea | timeline score: 3 | |
Feb 10 at 16:50 | history | edited | ocrdu | CC BY-SA 4.0 |
added 15 characters in body; edited title
|
Feb 10 at 16:43 | comment | added | Andrew Morton | Just to be sure, are you saying there is a total of 80 connections? Have you considered using mezzanine connectors with a cable between? | |
Feb 10 at 16:27 | history | asked | Eng Sam | CC BY-SA 4.0 |